IAC logo
IAC Assessment: TN0627
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0627
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product Automotive parts racks
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 100,000
Annual Production 3,800 Pieces
Production Hrs. Annual 2,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,698 990,035 kWh $0.04
Electricity Demand $24,068 3,694 kW-months/year $6.52
Electricity Fees $(-14,849) - $ -
Natural Gas $14,640 2,791 MMBtu $5.25
TOTAL ENERGY COSTS $60,320
RECOMMENDED SAVINGS* $26,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
01: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$10,875
Cost:
-
- - - - - - - - - - - - $10,875 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
$10,875
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$10,100
Cost:
$1,600
- - - - - - $100 - $10,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$100
-
$
$10,000
-
$
-
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,550
Cost:
$2,900
- - - - - - - - - - $2,550 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$2,550
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,330
Cost:
$490
$870 28,136 $1,460 168 - - - - - - - - - - $870
28,136
kWh
$1,460
168
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$640
Cost:
$960
$640 20,516 - - - - - - - - - - - - $640
20,516
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$360
Cost:
-
- - - - $360 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$360
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$26,855
Cost:
$5,950
$1,510 48,652 $1,460 168 $360 - $100 - $10,000 - $2,550 - $10,875 - $1,510
48,652
kWh
$1,460
168
kW-months/year
$360
-
lb
$100
-
$
$10,000
-
$
$2,550
-
$
$10,875
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product