IAC logo
IAC Assessment: TN0644
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0644
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1998
Principal Product High density polyethylene conduit and water pipe
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 112,500
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,435 9,299,531 kWh $0.03
Electricity Demand $66,127 15,710 kW-months/year $4.21
Electricity Fees $73,851 - $ -
Natural Gas $10,756 1,329 MMBtu $8.09
TOTAL ENERGY COSTS $421,169
RECOMMENDED SAVINGS* $439,485 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,400
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 3.5215 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK Savings:
$363,750
Cost:
$20,000
- - - - - - - - $(-30,000) - $393,750 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$(-30,000)
-
$
$393,750
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$32,370
Cost:
$50,000
- - - - - - $(-20,000) - - - $52,370 - -
-
kWh
-
-
kW-months/year
-
-
$
$(-20,000)
-
$
-
-
$
$52,370
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$17,850
Cost:
$32,200
- - - - - - - - - - $17,850 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$17,850
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,910
Cost:
$1,440
- - - - $11,910 - - - - - - - -
-
kWh
-
-
kW-months/year
$11,910
-
$
-
-
$
-
-
$
-
-
$
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$7,575
Cost:
$8,575
$6,880 275,205 $695 165 - - - - - - - - $6,880
275,205
kWh
$695
165
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,180
Cost:
$2,030
$2,020 80,891 $1,160 276 - - - - - - - - $2,020
80,891
kWh
$1,160
276
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,850
Cost:
$1,100
$2,290 91,735 $560 132 - - - - - - - - $2,290
91,735
kWh
$560
132
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$439,485
Cost:
$115,345
$11,190 447,831 $2,415 573 $11,910 - $(-20,000) - $(-30,000) - $463,970 - $11,190
447,831
kWh
$2,415
573
kW-months/year
$11,910
-
$
$(-20,000)
-
$
$(-30,000)
-
$
$463,970
-
$
TOTAL IMPLEMENTED Savings:
$53,400
Cost:
$84,230
$2,020 80,891 $1,160 276 - - $(-20,000) - - - $70,220 - $2,020
80,891
kWh
$1,160
276
kW-months/year
-
-
$
$(-20,000)
-
$
-
-
$
$70,220
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Primary Product