IAC Assessment: TN0653
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0653
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Military Footwear
NAICS n/a
SIC 3143 - Men's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 90,500
Annual Production 200,000 Pieces
Production Hrs. Annual 2,940
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,951 2,336,460 kWh $0.03
Electricity Demand $76,202 9,337 kW-months/year $8.16
Electricity Fees $7,416 - $ -
LPG $8,349 821 MMBtu $10.17
Fuel Oil #2 $28,976 3,849 MMBtu $7.53
TOTAL ENERGY COSTS $202,214
RECOMMENDED SAVINGS* $468,745 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $227,780
#|Description Savings
Cost
Status Electricity Usage Natural Gas LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Natural Gas LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product
$ kWh $ MMBtu $ MMBtu $ MMBtu $ lb $ $ $ $ $ $ $ $
01: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$218,445
Cost:
$60,080
$(-1,000) (-39,859) - - - - - - - - - - $269,445 - $(-50,000) - - - $(-1,000)
(-39,859)
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
$269,445
-
$
$(-50,000)
-
$
-
-
$
02: 4.451 ADD ADDITIONAL PRODUCTION SHIFT Savings:
$192,000
Cost:
$61,600
- - - - - - - - - - - - - - - - $192,000 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
$192,000
-
$
03: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$22,520
Cost:
$33,250
$(-1,000) (-39,859) - - - - - - - - $23,520 - - - - - - - $(-1,000)
(-39,859)
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
lb
$23,520
-
$
-
-
$
-
-
$
-
-
$
04: 3.1121 USE MORE EFFICIENT ADHESIVE APPLICATORS Savings:
$14,650
Cost:
$18,420
- - - - - - - - $2,250 1,280 $11,760 - - - $640 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$2,250
1,280
lb
$11,760
-
$
-
-
$
$640
-
$
-
-
$
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$11,640
Cost:
$25,825
- - $(-25,685) (-4,670) $8,349 821 $28,976 3,849 - - - - - - - - - - -
-
kWh
$(-25,685)
(-4,670)
MMBtu
$8,349
821
MMBtu
$28,976
3,849
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$5,590
Cost:
$17,025
- - - - $5,590 550 - - - - - - - - - - - - -
-
kWh
-
-
MMBtu
$5,590
550
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,900
Cost:
$2,545
$3,900 155,627 - - - - - - - - - - - - - - - - $3,900
155,627
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$468,745
Cost:
$218,745
$1,900 75,909 $(-25,685) (-4,670) $13,939 1,371 $28,976 3,849 $2,250 1,280 $35,280 - $269,445 - $(-49,360) - $192,000 - $1,900
75,909
kWh
$(-25,685)
(-4,670)
MMBtu
$13,939
1,371
MMBtu
$28,976
3,849
MMBtu
$2,250
1,280
lb
$35,280
-
$
$269,445
-
$
$(-49,360)
-
$
$192,000
-
$
TOTAL IMPLEMENTED Savings:
$227,780
Cost:
$125,415
$3,900 155,627 $(-25,685) (-4,670) $13,939 1,371 $28,976 3,849 $2,250 1,280 $11,760 - - - $640 - $192,000 - $3,900
155,627
kWh
$(-25,685)
(-4,670)
MMBtu
$13,939
1,371
MMBtu
$28,976
3,849
MMBtu
$2,250
1,280
lb
$11,760
-
$
-
-
$
$640
-
$
$192,000
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ MMBtu $ lb $ $ $ $ $ $ $ $
Electricity Usage Natural Gas LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product Electricity Usage Natural Gas LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Primary Product