IAC logo
IAC Assessment: TN0662
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0662
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Electrolytic capactiors
NAICS n/a
SIC 3670 -
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 110,000
Annual Production 5,500,000 Pieces
Production Hrs. Annual 6,120
Location (State) SC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,985 6,173,212 kWh $0.02
Electricity Demand $156,659 12,567 kW-months/year $12.47
Electricity Fees $8,793 - $ -
Natural Gas $35,244 6,256 MMBtu $5.63
TOTAL ENERGY COSTS $308,681
RECOMMENDED SAVINGS* $133,310 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,060
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 4.7210 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$55,900
Cost:
$90,000
- - - - - - - - - - $55,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$55,900
-
$
02: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$45,000
Cost:
$30,000
- - - - - - - - $(-60,000) - $105,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$(-60,000)
-
$
$105,000
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$16,380
Cost:
$4,260
- - $16,380 105 - - - - - - - - -
-
kWh
$16,380
105
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$14,050
Cost:
$19,800
$11,580 234,467 - - $2,470 400 - - - - - - $11,580
234,467
kWh
-
-
kW-months/year
$2,470
400
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,010
Cost:
$1,460
- - - - $1,010 217 - - - - - - -
-
kWh
-
-
kW-months/year
$1,010
217
MMBtu
-
-
gal
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$970
Cost:
$2,225
- - - - $340 60 $630 2,700 - - - - -
-
kWh
-
-
kW-months/year
$340
60
MMBtu
$630
2,700
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$133,310
Cost:
$147,745
$11,580 234,467 $16,380 105 $3,820 677 $630 2,700 $(-60,000) - $160,900 - $11,580
234,467
kWh
$16,380
105
kW-months/year
$3,820
677
MMBtu
$630
2,700
gal
$(-60,000)
-
$
$160,900
-
$
TOTAL IMPLEMENTED Savings:
$60,060
Cost:
$51,260
$11,580 234,467 - - $3,480 617 - - $(-60,000) - $105,000 - $11,580
234,467
kWh
-
-
kW-months/year
$3,480
617
MMBtu
-
-
gal
$(-60,000)
-
$
$105,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Personnel Changes Primary Product