IAC logo
IAC Assessment: TN0663
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0663
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Military Parachutes
NAICS n/a
SIC 2399 - Fabricated Textile Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 70,000
Annual Production 14,000 Pieces
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,845 569,754 kWh $0.08
Electricity Demand $17,896 3,660 kW-months/year $4.89
Electricity Fees $2,105 - $ -
Natural Gas $53,157 10,130 MMBtu $5.25
TOTAL ENERGY COSTS $120,003
RECOMMENDED SAVINGS* $79,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,562
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,379
Cost:
$13,600
$5,923 126,026 - - - - - - - - $456 - $5,923
126,026
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$456
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$4,132
Cost:
$7,350
$4,132 87,925 - - - - - - - - - - $4,132
87,925
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,603
Cost:
$800
- - - - - - $103 - $1,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$103
-
lb
$1,500
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,041
Cost:
-
$496 10,551 - - $545 126 - - - - - - $496
10,551
kWh
-
-
kW-months/year
$545
126
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$992
Cost:
$750
$640 13,482 $352 6 - - - - - - - - $640
13,482
kWh
$352
6
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,950
Cost:
$800
- - - - - - $450 - $1,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$450
-
lb
$1,500
-
$
-
-
$
07: 4.112 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL Savings:
$56,000
Cost:
$161,000
- - - - - - - - $56,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$56,000
-
$
-
-
$
08: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$7,200
Cost:
$4,500
- - - - - - - - $7,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$7,200
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$79,297
Cost:
$188,800
$11,191 237,984 $352 6 $545 126 $553 - $66,200 - $456 - $11,191
237,984
kWh
$352
6
kW-months/year
$545
126
MMBtu
$553
-
lb
$66,200
-
$
$456
-
$
TOTAL IMPLEMENTED Savings:
$17,562
Cost:
$19,650
$7,059 150,059 $352 6 $545 126 $450 - $8,700 - $456 - $7,059
150,059
kWh
$352
6
kW-months/year
$545
126
MMBtu
$450
-
lb
$8,700
-
$
$456
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost