IAC logo
IAC Assessment: TN0671
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0671
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1999
Principal Product Candy
NAICS n/a
SIC 2064 - Candy & Other Confectionery Products
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 78,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 2,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,688 1,726,260 kWh $0.04
Electricity Demand $49,592 4,133 kW-months/year $12.00
Electricity Fees $7,416 - $ -
LPG $67,613 12,270 MMBtu $5.51
TOTAL ENERGY COSTS $191,309
RECOMMENDED SAVINGS* $460,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Product By-product Production
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$250,000
Cost:
$2,030
- - - - - - - - - - $250,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$250,000
-
$
-
-
$
02: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$108,400
Cost:
$34,670
- - - - - - - - - - $108,400 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$108,400
-
$
-
-
$
03: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$45,000
Cost:
$16,375
- - - - - - - - $45,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$45,000
-
$
-
-
$
-
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$28,195
Cost:
$1,075
$70 2,052 - - - - - - - - $28,125 - - - $70
2,052
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$28,125
-
$
-
-
$
05: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$21,560
Cost:
-
- - - - - - - - - - - - $21,560 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
$21,560
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,000
Cost:
$13,000
- - - - $4,000 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,000
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,680
Cost:
$11,780
$1,120 33,998 $1,560 1 - - - - - - - - - - $1,120
33,998
kWh
$1,560
1
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$360
Cost:
$305
- - - - - - $360 465 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$360
465
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$460,195
Cost:
$79,235
$1,190 36,050 $1,560 1 $4,000 - $360 465 $45,000 - $386,525 - $21,560 - $1,190
36,050
kWh
$1,560
1
kW-months/year
$4,000
-
$
$360
465
MMBtu
$45,000
-
$
$386,525
-
$
$21,560
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Product By-product Production Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Primary Product By-product Production