Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 2000 |
Principal Product | Steel doors and frames |
NAICS | n/a |
SIC | 3442 - Metal Doors, Sash, And Trim |
Sales | $1,000,000-$5,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 10,500 Pieces |
Production Hrs. Annual | 2,800 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Demand | $5,441 | 1,112 | kW-months/year | $4.89 |
Electricity Fees | $3,660 | - | $ | - |
Natural Gas | $5,381 | 850 | MMBtu | $6.33 |
LPG | $9,631 | 697 | MMBtu | $13.82 |
TOTAL ENERGY COSTS | $24,113 | |||
RECOMMENDED SAVINGS* | $3,880 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,235 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Primary Product | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,075 Cost: $2,610 |
- | - | $1,075 | 170 | - | - | - | - | - | - |
- - kWh |
$1,075 170 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $980 Cost: $1,075 |
$40 | 879 | - | - | - | - | - | - | $940 | - |
$40 879 kWh |
- - MMBtu |
- - lb |
- - $ |
$940 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $715 Cost: $1,820 |
- | - | $715 | 113 | - | - | - | - | - | - |
- - kWh |
$715 113 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $710 Cost: - |
- | - | - | - | $710 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$710 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7131 USE A RAG RECYCLE SERVICE |
Savings: $240 Cost: - |
- | - | - | - | $1,200 | 2,400 | $(-960) | - | - | - |
- - kWh |
- - MMBtu |
$1,200 2,400 lb |
$(-960) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $160 Cost: - |
- | - | - | - | $160 | 1,950 | - | - | - | - |
- - kWh |
- - MMBtu |
$160 1,950 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,880 Cost: $5,505 |
$40 | 879 | $1,790 | 283 | $2,070 | 4,350 | $(-960) | - | $940 | - | $40 879 kWh |
$1,790 283 MMBtu |
$2,070 4,350 lb |
$(-960) - $ |
$940 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,235 Cost: $2,610 |
- | - | $1,075 | 170 | $160 | 1,950 | - | - | - | - | - - kWh |
$1,075 170 MMBtu |
$160 1,950 lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Primary Product | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Primary Product |