IAC Assessment: TN0673
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Steel doors and frames
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 38,000
Annual Production 10,500 Pieces
Production Hrs. Annual 2,800
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Demand $5,441 1,112 kW-months/year $4.89
Electricity Fees $3,660 - $ -
Natural Gas $5,381 850 MMBtu $6.33
LPG $9,631 697 MMBtu $13.82
TOTAL ENERGY COSTS $24,113
RECOMMENDED SAVINGS* $3,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,235
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,075
Cost:
$2,610
- - $1,075 170 - - - - - - -
-
kWh
$1,075
170
MMBtu
-
-
lb
-
-
$
-
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$980
Cost:
$1,075
$40 879 - - - - - - $940 - $40
879
kWh
-
-
MMBtu
-
-
lb
-
-
$
$940
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$715
Cost:
$1,820
- - $715 113 - - - - - - -
-
kWh
$715
113
MMBtu
-
-
lb
-
-
$
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$710
Cost:
-
- - - - $710 - - - - - -
-
kWh
-
-
MMBtu
$710
-
lb
-
-
$
-
-
$
05: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$240
Cost:
-
- - - - $1,200 2,400 $(-960) - - - -
-
kWh
-
-
MMBtu
$1,200
2,400
lb
$(-960)
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$160
Cost:
-
- - - - $160 1,950 - - - - -
-
kWh
-
-
MMBtu
$160
1,950
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$3,880
Cost:
$5,505
$40 879 $1,790 283 $2,070 4,350 $(-960) - $940 - $40
879
kWh
$1,790
283
MMBtu
$2,070
4,350
lb
$(-960)
-
$
$940
-
$
TOTAL IMPLEMENTED Savings:
$1,235
Cost:
$2,610
- - $1,075 170 $160 1,950 - - - - -
-
kWh
$1,075
170
MMBtu
$160
1,950
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product Electricity Usage Natural Gas Solid Waste (non-haz) Ancillary Material Cost Primary Product