IAC Assessment: TN0677
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0677
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Acrylic Bath Tubs and Shower Stalls
NAICS n/a
SIC 3088 - Plastics Plumbing Fixtures
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 34,000
Annual Production 8,750 Pieces
Production Hrs. Annual 2,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,951 443,142 kWh $0.03
Electricity Demand $10,391 1,732 kW-months/year $6.00
Electricity Fees $1,363 - $ -
Natural Gas $12,660 1,691 MMBtu $7.49
TOTAL ENERGY COSTS $126,861
RECOMMENDED SAVINGS* $47,556 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,356
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$30,000
Cost:
$30,000
- - - - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$30,000
-
$
02: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,356
Cost:
$5,625
- - - - - - $7,356 204,336 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$7,356
204,336
lb
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$4,766
Cost:
$15,450
- - - - $4,766 6,971 - - - - -
-
kWh
-
-
kW-months/year
$4,766
6,971
gal
-
-
lb
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,820
Cost:
$1,075
$120 3,517 - - - - - - $2,700 - $120
3,517
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$2,700
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,440
Cost:
$3,180
- - $1,440 20 - - - - - - -
-
kWh
$1,440
20
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,174
Cost:
$240
- - - - - - $1,174 4,000 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,174
4,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$47,556
Cost:
$55,570
$120 3,517 $1,440 20 $4,766 6,971 $8,530 208,336 $32,700 - $120
3,517
kWh
$1,440
20
kW-months/year
$4,766
6,971
gal
$8,530
208,336
lb
$32,700
-
$
TOTAL IMPLEMENTED Savings:
$7,356
Cost:
$5,625
- - - - - - $7,356 204,336 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$7,356
204,336
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Primary Product