Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 2000 |
Principal Product | Pick-up Truck Bedliners |
NAICS | n/a |
SIC | 3713 - Truck And Bus Bodies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 250,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $123,277 | 3,569,168 | kWh | $0.03 |
Electricity Demand | $67,309 | 7,671 | kW-months/year | $8.77 |
Natural Gas | $189,821 | 42,293 | MMBtu | $4.49 |
TOTAL ENERGY COSTS | $1,690,793 | |||
RECOMMENDED SAVINGS* | $468,936 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $164,700 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $164,700 Cost: $600 |
- | - | - | - | $164,700 | 48,600 | - | - |
- - kWh |
- - kW-months/year |
$164,700 48,600 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION |
Savings: $151,244 Cost: $350,000 |
- | - | - | - | - | - | $151,244 | - |
- - kWh |
- - kW-months/year |
- - lb |
$151,244 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.421 MODIFY CURRENT INCENTIVE PROGRAM |
Savings: $90,000 Cost: $16,375 |
- | - | - | - | - | - | $90,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
$90,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS |
Savings: $49,460 Cost: $129,400 |
- | - | - | - | $49,460 | - | - | - |
- - kWh |
- - kW-months/year |
$49,460 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $10,967 Cost: $3,810 |
- | - | $10,967 | 96 | - | - | - | - |
- - kWh |
$10,967 96 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,572 Cost: $130 |
$1,572 | 50,703 | - | - | - | - | - | - |
$1,572 50,703 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $993 Cost: - |
$536 | 17,292 | $457 | 4 | - | - | - | - |
$536 17,292 kWh |
$457 4 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $468,936 Cost: $500,315 |
$2,108 | 67,995 | $11,424 | 100 | $214,160 | 48,600 | $241,244 | - | $2,108 67,995 kWh |
$11,424 100 kW-months/year |
$214,160 48,600 lb |
$241,244 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $164,700 Cost: $600 |
- | - | - | - | $164,700 | 48,600 | - | - | - - kWh |
- - kW-months/year |
$164,700 48,600 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Product |