IAC logo
IAC Assessment: TN0679
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0679
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Pick-up Truck Bedliners
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 100,000
Annual Production 250,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,277 3,569,168 kWh $0.03
Electricity Demand $67,309 7,671 kW-months/year $8.77
Natural Gas $189,821 42,293 MMBtu $4.49
TOTAL ENERGY COSTS $1,690,793
RECOMMENDED SAVINGS* $468,936 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $164,700
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ lb $ $
01: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$164,700
Cost:
$600
- - - - $164,700 48,600 - - -
-
kWh
-
-
kW-months/year
$164,700
48,600
lb
-
-
$
02: 4.721 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$151,244
Cost:
$350,000
- - - - - - $151,244 - -
-
kWh
-
-
kW-months/year
-
-
lb
$151,244
-
$
03: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$90,000
Cost:
$16,375
- - - - - - $90,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$90,000
-
$
04: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$49,460
Cost:
$129,400
- - - - $49,460 - - - -
-
kWh
-
-
kW-months/year
$49,460
-
lb
-
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$10,967
Cost:
$3,810
- - $10,967 96 - - - - -
-
kWh
$10,967
96
kW-months/year
-
-
lb
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,572
Cost:
$130
$1,572 50,703 - - - - - - $1,572
50,703
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$993
Cost:
-
$536 17,292 $457 4 - - - - $536
17,292
kWh
$457
4
kW-months/year
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$468,936
Cost:
$500,315
$2,108 67,995 $11,424 100 $214,160 48,600 $241,244 - $2,108
67,995
kWh
$11,424
100
kW-months/year
$214,160
48,600
lb
$241,244
-
$
TOTAL IMPLEMENTED Savings:
$164,700
Cost:
$600
- - - - $164,700 48,600 - - -
-
kWh
-
-
kW-months/year
$164,700
48,600
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Solid Waste (non-haz) Primary Product