IAC logo
IAC Assessment: TN0682
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0682
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Small electric motors
NAICS n/a
SIC 3621 - Motors And Generators
Sales $5,000,000-$10,000,000
# of Employees 175
Plant Area (Sq.Ft.) 65,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,818 1,944,607 kWh $0.04
Electricity Demand $43,034 5,389 kW-months/year $7.99
Electricity Fees $2,115 - $ -
Natural Gas $48,328 7,874 MMBtu $6.14
TOTAL ENERGY COSTS $425,024
RECOMMENDED SAVINGS* $134,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $67,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste Administrative Changes Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $
01: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$37,600
Cost:
$7,800
- - - - - - $12,600 500,000 - - - - - - $25,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,600
500,000
lb
-
-
lb
-
-
$
-
-
$
$25,000
-
$
02: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$30,000
Cost:
$26,000
- - - - - - - - - - $30,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$30,000
-
$
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,410
Cost:
$49,230
$23,340 359,027 $6,070 63 - - - - - - - - - - - - $23,340
359,027
kWh
$6,070
63
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES Savings:
$27,490
Cost:
$300
- - - - - - - - $27,490 13,743 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$27,490
13,743
lb
-
-
$
-
-
$
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$6,460
Cost:
$3,340
$6,170 94,959 - - - - - - - - - - $290 - - - $6,170
94,959
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
$290
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,650
Cost:
$215
$1,960 30,188 $690 7 - - - - - - - - - - - - $1,960
30,188
kWh
$690
7
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$505
Cost:
$800
- - - - $505 88 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$505
88
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$134,115
Cost:
$87,685
$31,470 484,174 $6,760 70 $505 88 $12,600 500,000 $27,490 13,743 $30,000 - $290 - $25,000 - $31,470
484,174
kWh
$6,760
70
kW-months/year
$505
88
MMBtu
$12,600
500,000
lb
$27,490
13,743
lb
$30,000
-
$
$290
-
$
$25,000
-
$
TOTAL IMPLEMENTED Savings:
$67,600
Cost:
$33,800
- - - - - - $12,600 500,000 - - $30,000 - - - $25,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,600
500,000
lb
-
-
lb
$30,000
-
$
-
-
$
$25,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste Administrative Changes Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Gaseous Waste Administrative Changes Ancillary Material Cost By-product Production