IAC Assessment: TN0689
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0689
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product dry-type transformers
NAICS n/a
SIC 3612 - Transformers, Except Electronic
Sales $10,000,000-$50,000,000
# of Employees 252
Plant Area (Sq.Ft.) 150,000
Annual Production 62,000 Pieces
Production Hrs. Annual 2,340
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,448 2,252,052 kWh $0.03
Electricity Demand $33,457 7,684 kW-months/year $4.35
Natural Gas $124,433 25,526 MMBtu $4.87
TOTAL ENERGY COSTS $574,712
RECOMMENDED SAVINGS* $169,505 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $112,215
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
01: 4.7210 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION Savings:
$97,005
Cost:
$100,000
$6,470 184,349 - - - - $535 2,785 - - - - $90,000 - $6,470
184,349
kWh
-
-
kW-months/year
-
-
MMBtu
$535
2,785
lb
-
-
lb
-
-
$
$90,000
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$35,890
Cost:
$108,460
- - - - $31,880 6,505 - - $4,010 16,765 - - - - -
-
kWh
-
-
kW-months/year
$31,880
6,505
MMBtu
-
-
lb
$4,010
16,765
lb
-
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$8,180
Cost:
$18,900
- - $8,180 96 - - - - - - - - - - -
-
kWh
$8,180
96
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,245
Cost:
$5,625
- - - - - - $1,255 69,660 - - $5,990 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,255
69,660
lb
-
-
lb
$5,990
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,460
Cost:
$19,500
$6,460 386,284 - - - - - - - - - - - - $6,460
386,284
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
06: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$6,220
Cost:
-
- - - - - - - - - - $6,220 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$6,220
-
$
-
-
$
07: 3.8124 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION Savings:
$4,345
Cost:
$300
- - - - - - - - $4,345 12,418 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,345
12,418
lb
-
-
$
-
-
$
08: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$3,620
Cost:
$6,160
$3,620 77,960 - - - - - - - - - - - - $3,620
77,960
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$540
Cost:
-
$310 11,430 $230 3 - - - - - - - - - - $310
11,430
kWh
$230
3
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$169,505
Cost:
$258,945
$16,860 660,023 $8,410 99 $31,880 6,505 $1,790 72,445 $8,355 29,183 $12,210 - $90,000 - $16,860
660,023
kWh
$8,410
99
kW-months/year
$31,880
6,505
MMBtu
$1,790
72,445
lb
$8,355
29,183
lb
$12,210
-
$
$90,000
-
$
TOTAL IMPLEMENTED Savings:
$112,215
Cost:
$112,085
$10,090 262,309 - - - - $1,790 72,445 $4,345 12,418 $5,990 - $90,000 - $10,090
262,309
kWh
-
-
kW-months/year
-
-
MMBtu
$1,790
72,445
lb
$4,345
12,418
lb
$5,990
-
$
$90,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Product