IAC Assessment: TN0693
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0693
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product lawn mowers
NAICS n/a
SIC 3524 - Lawn And Garden Equipment
Sales $100,000,000-$500,000,000
# of Employees 360
Plant Area (Sq.Ft.) 160,000
Annual Production 440,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,135 4,081,477 kWh $0.03
Electricity Demand $80,353 10,000 kW-months/year $8.04
TOTAL ENERGY COSTS $478,618
RECOMMENDED SAVINGS* $205,709 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $106,272
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$77,500
Cost:
$35,600
- - - - - - $77,500 - -
-
kWh
-
-
kW-months/year
-
-
lb
$77,500
-
$
02: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$69,815
Cost:
$1,200
- - - - $69,815 1,135,200 - - -
-
kWh
-
-
kW-months/year
$69,815
1,135,200
lb
-
-
$
03: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$22,100
Cost:
$8,120
$22,100 404,748 - - - - - - $22,100
404,748
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$12,000
Cost:
$35,070
$12,000 319,168 - - - - - - $12,000
319,168
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$11,176
Cost:
$379
$7,287 227,726 $3,889 3,795 - - - - $7,287
227,726
kWh
$3,889
3,795
kW-months/year
-
-
lb
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,508
Cost:
$18,900
- - $8,508 83 - - - - -
-
kWh
$8,508
83
kW-months/year
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,503
Cost:
$900
$816 25,498 $687 7 - - - - $816
25,498
kWh
$687
7
kW-months/year
-
-
lb
-
-
$
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,357
Cost:
$490
$1,435 44,842 $922 9 - - - - $1,435
44,842
kWh
$922
9
kW-months/year
-
-
lb
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$750
Cost:
$570
- - - - $750 10,000 - - -
-
kWh
-
-
kW-months/year
$750
10,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$205,709
Cost:
$101,229
$43,638 1,021,982 $14,006 3,894 $70,565 1,145,200 $77,500 - $43,638
1,021,982
kWh
$14,006
3,894
kW-months/year
$70,565
1,145,200
lb
$77,500
-
$
TOTAL IMPLEMENTED Savings:
$106,272
Cost:
$44,880
$35,535 768,758 $922 9 $69,815 1,135,200 - - $35,535
768,758
kWh
$922
9
kW-months/year
$69,815
1,135,200
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes