IAC logo
IAC Assessment: TN0696
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0696
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 2000
Principal Product Refrigerator compressors
NAICS n/a
SIC 3415 -
Sales $50,000,000-$100,000,000
# of Employees 670
Plant Area (Sq.Ft.) 330,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $823,644 35,715,710 kWh $0.02
Electricity Demand $416,185 66,761 kW-months/year $6.23
Natural Gas $505,038 122,668 MMBtu $4.12
TOTAL ENERGY COSTS $3,151,067
RECOMMENDED SAVINGS* $664,573 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $321,273
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal $ $ $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$184,000
Cost:
$44,000
- - - - - - - - - - - - - - $184,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
$184,000
-
$
02: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$182,800
Cost:
$173,400
$19,200 833,822 $18,000 577 - - $105,200 34,145,317 - - $40,400 - - - - - $19,200
833,822
kWh
$18,000
577
kW-months/year
-
-
MMBtu
$105,200
34,145,317
Tgal
-
-
$
$40,400
-
Tgal
-
-
$
-
-
$
03: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$78,500
Cost:
$16,450
- - - - - - - - - - - - - - $78,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
$78,500
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$68,153
Cost:
$6,800
$52,902 2,300,117 $15,251 204 - - - - - - - - - - - - $52,902
2,300,117
kWh
$15,251
204
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$50,500
Cost:
-
- - - - - - - - $50,500 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$50,500
-
$
-
-
Tgal
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$35,400
Cost:
$18,900
- - $35,400 473 - - - - - - - - - - - - -
-
kWh
$35,400
473
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
-
-
$
07: 2.2521 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS Savings:
$31,500
Cost:
-
- - - - $31,500 1,531 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$31,500
1,531
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
-
-
$
-
-
$
08: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$33,720
Cost:
$5,075
$15,300 663,540 - - - - - - - - - - $15,300 - $3,120 - $15,300
663,540
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
$15,300
-
$
$3,120
-
$
TOTAL RECOMMENDED Savings:
$664,573
Cost:
$264,625
$87,402 3,797,479 $68,651 1,254 $31,500 1,531 $105,200 34,145,317 $50,500 - $40,400 - $15,300 - $265,620 - $87,402
3,797,479
kWh
$68,651
1,254
kW-months/year
$31,500
1,531
MMBtu
$105,200
34,145,317
Tgal
$50,500
-
$
$40,400
-
Tgal
$15,300
-
$
$265,620
-
$
TOTAL IMPLEMENTED Savings:
$321,273
Cost:
$74,775
$68,202 2,963,657 $50,651 677 - - - - - - - - $15,300 - $187,120 - $68,202
2,963,657
kWh
$50,651
677
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
$15,300
-
$
$187,120
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Water Consumption One-time Revenue or Avoided Cost Primary Product