IAC logo
IAC Assessment: TP0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TP0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Prairie View, A&M
Assessment Year 2000
Principal Product Photograph albums
NAICS n/a
SIC 3652 - Prerecorded Records And Tapes
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 980,800 Pieces
Production Hrs. Annual 2,584
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,832 676,436 kWh $0.06
Electricity Demand $7,912 2,234 kW-months/year $3.54
Natural Gas $1,029 180 MMBtu $5.72
TOTAL ENERGY COSTS $46,773
RECOMMENDED SAVINGS* $22,149 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $270
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Raw Material Primary Product Electricity Usage Electricity Demand Primary Raw Material Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$12,967
Cost:
-
- - - - $12,967 - - - -
-
kWh
-
-
kW-months/year
$12,967
-
$
-
-
$
02: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$3,047
Cost:
$96
- - - - - - $3,047 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,047
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,048
Cost:
$3,875
$3,867 103,458 $1,181 180 - - - - $3,867
103,458
kWh
$1,181
180
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$460
Cost:
$509
$259 7,034 $201 31 - - - - $259
7,034
kWh
$201
31
kW-months/year
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$357
Cost:
$384
$357 5,862 - - - - - - $357
5,862
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$270
Cost:
$1,948
$149 4,103 $121 19 - - - - $149
4,103
kWh
$121
19
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$22,149
Cost:
$6,812
$4,632 120,457 $1,503 230 $12,967 - $3,047 - $4,632
120,457
kWh
$1,503
230
kW-months/year
$12,967
-
$
$3,047
-
$
TOTAL IMPLEMENTED Savings:
$270
Cost:
$1,948
$149 4,103 $121 19 - - - - $149
4,103
kWh
$121
19
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Primary Raw Material Primary Product Electricity Usage Electricity Demand Primary Raw Material Primary Product