IAC logo
IAC Assessment: TP0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TP0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Prairie View, A&M
Assessment Year 2000
Principal Product Jet Fuel testing equipment
NAICS n/a
SIC 3724 - Aircraft Engines And Engine Parts
Sales $1,000,000-$5,000,000
# of Employees 56
Plant Area (Sq.Ft.) 0
Annual Production 65,000 Pieces
Production Hrs. Annual 2,125
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,643 662,368 kWh $0.04
Electricity Demand $13,375 1,992 kW-months/year $6.71
Natural Gas $667 148 MMBtu $4.51
TOTAL ENERGY COSTS $38,685
RECOMMENDED SAVINGS* $57,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $ $ $
01: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$52,800
Cost:
$48,300
- - - - - - $52,800 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$52,800
-
$
-
-
$
02: 3.7124 INSTALL DEDICATED MIXING EQUIP TO OPTIMIZE REUSE OF USED RINSEATE & TO PRECLUDE THE NEED FOR INTER-RUN CLEANING Savings:
$3,716
Cost:
$2,056
- - - - $3,716 4,000 - - - - -
-
kWh
-
-
kW-months/year
$3,716
4,000
gal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$843
Cost:
$700
$107 3,517 $33 5 - - - - $703 - $107
3,517
kWh
$33
5
kW-months/year
-
-
gal
-
-
$
$703
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$279
Cost:
$847
$279 8,792 - - - - - - - - $279
8,792
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$57,638
Cost:
$51,903
$386 12,309 $33 5 $3,716 4,000 $52,800 - $703 - $386
12,309
kWh
$33
5
kW-months/year
$3,716
4,000
gal
$52,800
-
$
$703
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Ancillary Material Cost