IAC Assessment: TR0001
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TR0001
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2017
Principal Product Valves
NAICS 332911 - Industrial Valve Manufacturing
SIC 3491 - Industrial Valves
Sales $1,000,000-$5,000,000
# of Employees 113
Plant Area (Sq.Ft.) 101,000
Annual Production 50,000 Units
Production Hrs. Annual 2,016
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $278,011 3,169,440 kWh $0.09
Electricity Demand $3,191 968 kW-months/year $3.30
Natural Gas $1,131 102 MMBtu $11.09
TOTAL ENERGY COSTS $282,333
RECOMMENDED SAVINGS* $56,304 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,161
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$19,042
Cost:
$5,000
- - - - $19,042 - - - - - - - -
-
kWh
-
-
kW-months/year
$19,042
-
$
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,935
Cost:
$23,676
$5,946 67,569 $989 293 - - - - - - - - $5,946
67,569
kWh
$989
293
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$112
Cost:
-
$112 1,277 - - - - - - - - - - $112
1,277
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$441
Cost:
$237
$126 1,430 $7 2 - - $72 - - - $237 - $126
1,430
kWh
$7
2
kW-months/year
-
-
$
$72
-
$
-
-
$
$237
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$5,143
Cost:
$50
- - - - - - - - $5,143 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$5,143
-
$
-
-
$
06: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$9,766
Cost:
$5,000
$9,766 110,976 - - - - - - - - - - $9,766
110,976
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,442
Cost:
$2,500
$11,522 130,928 $1,920 568 - - - - - - - - $11,522
130,928
kWh
$1,920
568
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,422
Cost:
$6
$1,220 13,860 $203 60 - - - - - - - - $1,220
13,860
kWh
$203
60
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,304
Cost:
$36,469
$28,691 326,039 $3,119 923 $19,042 - $72 - $5,143 - $237 - $28,691
326,039
kWh
$3,119
923
kW-months/year
$19,042
-
$
$72
-
$
$5,143
-
$
$237
-
$
TOTAL IMPLEMENTED Savings:
$51,161
Cost:
$36,419
$28,691 326,039 $3,119 923 $19,042 - $72 - - - $237 - $28,691
326,039
kWh
$3,119
923
kW-months/year
$19,042
-
$
$72
-
$
-
-
$
$237
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes Primary Raw Material Ancillary Material Cost