IAC Assessment: TR0005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TR0005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2017
Principal Product Blades, Nozzles, and Hangers
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $1,000,000-$5,000,000
# of Employees 500
Plant Area (Sq.Ft.) 108,000
Annual Production 200,000 Pieces
Production Hrs. Annual 8,544
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $605,704 18,643,402 kWh $0.03
Electricity Demand $528,871 47,946 kW-months/year $11.03
Electricity Fees $33,914 - $ -
Natural Gas $29,914 11,104 MMBtu $2.69
TOTAL ENERGY COSTS $1,231,462
RECOMMENDED SAVINGS* $307,395 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $306,047
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$4,452
Cost:
$6,500
$4,452 140,229 - - - - - - $4,452
140,229
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$1,056
Cost:
$417
$1,056 33,139 - - - - - - $1,056
33,139
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
03: 3.4146 CHANGE METHOD OF DEIONIZED WATER PRODUCTION Savings:
$258,000
Cost:
$292,000
- - - - - - $258,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$258,000
-
$
04: 3.4155 METER WASTE WATER Savings:
$11,708
Cost:
$2,650
- - - - $11,708 417 - - -
-
kWh
-
-
kW-months/year
$11,708
417
Tgal
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$15,338
Cost:
$56,000
- - $15,338 1,032 - - - - -
-
kWh
$15,338
1,032
kW-months/year
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,836
Cost:
$8,821
$1,836 57,816 - - - - - - $1,836
57,816
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$223
Cost:
$399
$223 7,008 - - - - - - $223
7,008
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$287
Cost:
$494
$287 9,054 - - - - - - $287
9,054
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
09: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$292
Cost:
$1,422
$292 9,209 - - - - - - $292
9,209
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
10: 2.2521 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS Savings:
$8,320
Cost:
$966
$8,320 262,056 - - - - - - $8,320
262,056
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,882
Cost:
$25,954
$5,882 185,274 - - - - - - $5,882
185,274
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$307,395
Cost:
$395,623
$22,349 703,785 $15,338 1,032 $11,708 417 $258,000 - $22,349
703,785
kWh
$15,338
1,032
kW-months/year
$11,708
417
Tgal
$258,000
-
$
TOTAL IMPLEMENTED Savings:
$306,047
Cost:
$393,784
$21,001 661,437 $15,338 1,032 $11,708 417 $258,000 - $21,001
661,437
kWh
$15,338
1,032
kW-months/year
$11,708
417
Tgal
$258,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost