Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas Rio Grande Valley |
---|---|
Assessment Year | 2018 |
Principal Product | Grinding Wheels |
NAICS | 327910 - Abrasive Product Manufacturing |
SIC | 3291 - Abrasive Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 117 |
Plant Area (Sq.Ft.) | 153,578 |
Annual Production | 10,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $197,815 | 6,550,320 | kWh | $0.03 |
Electricity Demand | $103,152 | 12,867 | kW-months/year | $8.02 |
TOTAL ENERGY COSTS | $321,040 | |||
RECOMMENDED SAVINGS* | $69,007 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $61,497 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $34,558 Cost: $3,000 |
$34,558 | 1,144,348 | - | - | - | - |
$34,558 1,144,348 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $5,927 Cost: $22,500 |
- | - | $5,927 | 739 | - | - |
- - kWh |
$5,927 739 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5318 RECYCLE FLUORESCENT LAMPS |
Savings: $10,606 Cost: $23,530 |
$10,606 | 351,199 | - | - | - | - |
$10,606 351,199 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4155 METER WASTE WATER |
Savings: $6,760 Cost: $2,650 |
- | - | - | - | $6,760 | 1,760 |
- - kWh |
- - kW-months/year |
$6,760 1,760 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $5,572 Cost: $500 |
$5,572 | 184,521 | - | - | - | - |
$5,572 184,521 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,304 Cost: $6,855 |
$4,304 | 142,517 | - | - | - | - |
$4,304 142,517 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $750 Cost: $2,212 |
- | - | - | - | $750 | 195 |
- - kWh |
- - kW-months/year |
$750 195 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $421 Cost: $38 |
$421 | 13,927 | - | - | - | - |
$421 13,927 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $109 Cost: $195 |
$109 | 3,614 | - | - | - | - |
$109 3,614 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $69,007 Cost: $61,480 |
$55,570 | 1,840,125 | $5,927 | 739 | $7,510 | 1,956 | $55,570 1,840,125 kWh |
$5,927 739 kW-months/year |
$7,510 1,956 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $61,497 Cost: $56,618 |
$55,570 | 1,840,125 | $5,927 | 739 | - | - | $55,570 1,840,125 kWh |
$5,927 739 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal |