Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2020
Principal Product Car Seat Trim
NAICS 336360 - Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2396 - Automotive And Apparel Trimmings
Sales $1,000,000-$5,000,000
# of Employees 123
Plant Area (Sq.Ft.) 134,400
Annual Production 100,000 Units
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,129 1,797,840 kWh $0.05
Electricity Demand $50,311 4,991 kW-months/year $10.08
Electricity Fees $2,660 - $ -
TOTAL ENERGY COSTS $140,100
RECOMMENDED SAVINGS* $42,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,459
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$183
Cost:
$210
$183 3,974 - - $183
3,974
kWh
-
-
kW-months/year
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$35,728
Cost:
$7,275
$35,728 744,324 - - $35,728
744,324
kWh
-
-
kW-months/year
03: 3.1131 USE MECHANICAL STRIPPING METHODS Savings:
$2,731
Cost:
$666
$2,731 59,393 - - $2,731
59,393
kWh
-
-
kW-months/year
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,409
Cost:
-
$3,099 67,378 $310 67 $3,099
67,378
kWh
$310
67
kW-months/year
TOTAL RECOMMENDED Savings:
$42,051
Cost:
$8,151
$41,741 875,069 $310 67 $41,741
875,069
kWh
$310
67
kW-months/year
TOTAL IMPLEMENTED Savings:
$38,459
Cost:
$7,941
$38,459 803,717 - - $38,459
803,717
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand