Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas Rio Grande Valley |
---|---|
Assessment Year | 2020 |
Principal Product | Aloe Vera juice and concentrates |
NAICS | 325611 - Soap and Other Detergent Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 71,515 |
Annual Production | 1,509 Tons |
Production Hrs. Annual | 2,900 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $130,422 | 1,549,720 | kWh | $0.08 |
Electricity Demand | $47,732 | 4,567 | kW-months/year | $10.45 |
Electricity Fees | $346 | - | $ | - |
Natural Gas | $17,906 | 2,863 | MMBtu | $6.25 |
TOTAL ENERGY COSTS | $196,406 | |||
RECOMMENDED SAVINGS* | $11,601 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,601 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $657 Cost: $440 |
$657 | 7,830 | - | - | - | - | - | - |
$657 7,830 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,326 Cost: $1,145 |
$878 | 10,471 | $448 | 43 | - | - | - | - |
$878 10,471 kWh |
$448 43 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,067 Cost: $830 |
- | - | - | - | $1,067 | 171 | - | - |
- - kWh |
- - kW-months/year |
$1,067 171 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,683 Cost: $130 |
$3 | 33 | - | - | $27 | 4 | $1,653 | 289 |
$3 33 kWh |
- - kW-months/year |
$27 4 MMBtu |
$1,653 289 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $371 Cost: $676 |
$371 | 4,420 | - | - | - | - | - | - |
$371 4,420 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,497 Cost: $9,060 |
$4,302 | 51,295 | $2,195 | 212 | - | - | - | - |
$4,302 51,295 kWh |
$2,195 212 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,601 Cost: $12,281 |
$6,210 | 74,049 | $2,643 | 256 | $1,095 | 175 | $1,653 | 289 | $6,210 74,049 kWh |
$2,643 256 kW-months/year |
$1,095 175 MMBtu |
$1,653 289 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,601 Cost: $12,281 |
$6,210 | 74,049 | $2,643 | 256 | $1,095 | 175 | $1,653 | 289 | $6,210 74,049 kWh |
$2,643 256 kW-months/year |
$1,095 175 MMBtu |
$1,653 289 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage |