Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas Rio Grande Valley |
---|---|
Assessment Year | 2022 |
Principal Product | Electro plating and metal finikshing |
NAICS | 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471 - Plating And Polishing |
Sales | $50,000,000-$100,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 6,000,000 Pieces |
Production Hrs. Annual | 5,200 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $128,487 | 2,399,440 | kWh | $0.05 |
Electricity Demand | $62,522 | 6,175 | kW-months/year | $10.13 |
Electricity Fees | $2,976 | - | $ | - |
Natural Gas | $79,250 | 7,132 | MMBtu | $11.11 |
TOTAL ENERGY COSTS | $275,751 | |||
RECOMMENDED SAVINGS* | $22,823 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,344 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,361 Cost: $5,404 |
$4,935 | 91,975 | $1,425 | 141 | - | - |
$4,935 91,975 kWh |
$1,425 141 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,972 Cost: $3,155 |
$4,857 | 90,514 | $2,115 | 209 | - | - |
$4,857 90,514 kWh |
$2,115 209 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $7,119 Cost: $11,200 |
$5,657 | 105,419 | $1,462 | 144 | - | - |
$5,657 105,419 kWh |
$1,462 144 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,584 Cost: $602 |
$1,150 | 21,437 | $434 | 43 | - | - |
$1,150 21,437 kWh |
$434 43 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $787 Cost: $1,511 |
- | - | - | - | $787 | 1,964 |
- - kWh |
- - kW-months/year |
$787 1,964 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,823 Cost: $21,872 |
$16,600 | 309,345 | $5,436 | 537 | $787 | 1,964 | $16,600 309,345 kWh |
$5,436 537 kW-months/year |
$787 1,964 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,344 Cost: $5,268 |
$6,007 | 111,951 | $2,549 | 252 | $787 | 1,964 | $6,007 111,951 kWh |
$2,549 252 kW-months/year |
$787 1,964 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal |