IAC logo
IAC Assessment: TR0038
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TR0038
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2022
Principal Product Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $1,000,000-$5,000,000
# of Employees 2
Plant Area (Sq.Ft.) 16,723,737
Annual Production 220,000 Thousand Gallons
Production Hrs. Annual 5,840
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,781 409,680 kWh $0.04
Electricity Demand $15,908 1,385 kW-months/year $11.49
Electricity Fees $406 - $ -
TOTAL ENERGY COSTS $34,095
RECOMMENDED SAVINGS* $2,026 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,357
#|Description Savings
Cost
Status Electricity Usage Primary Raw Material Ancillary Material Cost Electricity Usage Primary Raw Material Ancillary Material Cost
$ kWh $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$337
Cost:
$921
$337 7,830 - - - - $337
7,830
kWh
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$303
Cost:
$583
$303 7,054 - - - - $303
7,054
kWh
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$251
Cost:
$195
$251 5,827 - - - - $251
5,827
kWh
-
-
$
-
-
$
04: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$717
Cost:
$884
- - $4 - $712 - -
-
kWh
$4
-
$
$712
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$419
Cost:
$4,300
$419 9,738 - - - - $419
9,738
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$2,026
Cost:
$6,883
$1,309 30,450 $4 - $712 - $1,309
30,450
kWh
$4
-
$
$712
-
$
TOTAL IMPLEMENTED Savings:
$1,357
Cost:
$2,388
$640 14,884 $4 - $712 - $640
14,884
kWh
$4
-
$
$712
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Primary Raw Material Ancillary Material Cost Electricity Usage Primary Raw Material Ancillary Material Cost