Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Texas Rio Grande Valley |
---|---|
Assessment Year | 2022 |
Principal Product | Water |
NAICS | 221310 - Water Supply and Irrigation Systems |
SIC | 4941 - Water Supply |
Sales | $1,000,000-$5,000,000 |
# of Employees | 2 |
Plant Area (Sq.Ft.) | 16,723,737 |
Annual Production | 220,000 Thousand Gallons |
Production Hrs. Annual | 5,840 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $17,781 | 409,680 | kWh | $0.04 |
Electricity Demand | $15,908 | 1,385 | kW-months/year | $11.49 |
Electricity Fees | $406 | - | $ | - |
TOTAL ENERGY COSTS | $34,095 | |||
RECOMMENDED SAVINGS* | $2,026 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,357 |
#|Description |
Savings Cost |
Status | Electricity Usage | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Primary Raw Material | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $337 Cost: $921 |
$337 | 7,830 | - | - | - | - |
$337 7,830 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $303 Cost: $583 |
$303 | 7,054 | - | - | - | - |
$303 7,054 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $251 Cost: $195 |
$251 | 5,827 | - | - | - | - |
$251 5,827 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS |
Savings: $717 Cost: $884 |
- | - | $4 | - | $712 | - |
- - kWh |
$4 - $ |
$712 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $419 Cost: $4,300 |
$419 | 9,738 | - | - | - | - |
$419 9,738 kWh |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,026 Cost: $6,883 |
$1,309 | 30,450 | $4 | - | $712 | - | $1,309 30,450 kWh |
$4 - $ |
$712 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,357 Cost: $2,388 |
$640 | 14,884 | $4 | - | $712 | - | $640 14,884 kWh |
$4 - $ |
$712 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Primary Raw Material | Ancillary Material Cost | Electricity Usage | Primary Raw Material | Ancillary Material Cost |