Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Texas Rio Grande Valley
Assessment Year 2023
Principal Product Custom injection molding for consumer, medical, communications and automotive apps.
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 170,205
Annual Production 3,100,000 Pieces
Production Hrs. Annual 4,160
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,071 1,501,200 kWh $0.05
Electricity Demand $55,571 4,964 kW-months/year $11.19
Electricity Fees $5,919 - $ -
TOTAL ENERGY COSTS $135,969
RECOMMENDED SAVINGS* $35,672 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$31,832
Cost:
$216,216
$23,226 470,714 $8,606 769 - - $23,226
470,714
kWh
$8,606
769
kW-months/year
-
-
Tgal
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,706
Cost:
$7,350
$2,064 41,839 $641 57 - - $2,064
41,839
kWh
$641
57
kW-months/year
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$727
Cost:
$2,781
$439 8,902 $287 26 - - $439
8,902
kWh
$287
26
kW-months/year
-
-
Tgal
04: 3.4155 METER WASTE WATER Savings:
$408
Cost:
$1,511
- - - - $408 343 -
-
kWh
-
-
kW-months/year
$408
343
Tgal
TOTAL RECOMMENDED Savings:
$35,672
Cost:
$227,858
$25,729 521,455 $9,535 852 $408 343 $25,729
521,455
kWh
$9,535
852
kW-months/year
$408
343
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal