IAC logo
IAC Assessment: TS0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TS0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tri-Cities University
Assessment Year 1984
Principal Product MOLDED RUBBER PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 409
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $501,231 6,660,024 kWh $0.08
Natural Gas $326,605 80,207 MMBtu $4.07
TOTAL ENERGY COSTS $827,836
RECOMMENDED SAVINGS* $62,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,158
Cost:
$1,360
$8,158 100,821 - - $8,158
100,821
kWh
-
-
MMBtu
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$11,748
Cost:
-
$11,748 - - - $11,748
-
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$396
Cost:
$33
$445 5,569 $(-49) (-12) $445
5,569
kWh
$(-49)
(-12)
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,174
Cost:
$42,000
- - $15,174 3,449 -
-
kWh
$15,174
3,449
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,480
Cost:
$5,460
- - $11,480 2,609 -
-
kWh
$11,480
2,609
MMBtu
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$5,296
Cost:
-
$6,000 75,029 $(-704) (-160) $6,000
75,029
kWh
$(-704)
(-160)
MMBtu
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$10,352
Cost:
$25,218
- - $10,352 2,356 -
-
kWh
$10,352
2,356
MMBtu
TOTAL RECOMMENDED Savings:
$62,604
Cost:
$74,071
$26,351 181,419 $36,253 8,242 $26,351
181,419
kWh
$36,253
8,242
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas