IAC logo
IAC Assessment: TT0015
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0015
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2007
Principal Product Rubber O-Rings
NAICS 326291 - Rubber Product Manufacturing for Mechanical Use
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 40,200
Annual Production 24,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $387,764 8,495,400 kWh $0.05
Electricity Demand $245,958 18,791 kW-months/year $13.09
Natural Gas $22,892 1,381 MMBtu $16.58
TOTAL ENERGY COSTS $656,614
RECOMMENDED SAVINGS* $64,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,343
Cost:
$10,000
- - - - $8,343 - - - -
-
kWh
-
-
kW-months/year
$8,343
-
$
-
-
MMBtu
02: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$17,800
Cost:
$35,600
- - - - - - $17,800 1,075 -
-
kWh
-
-
kW-months/year
-
-
$
$17,800
1,075
MMBtu
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$2,000
Cost:
$1,600
$2,000 39,760 - - - - - - $2,000
39,760
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,236
Cost:
$99,598
$13,837 283,361 $19,399 1,356 - - - - $13,837
283,361
kWh
$19,399
1,356
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,011
Cost:
$16,913
$1,253 25,676 $1,758 124 - - - - $1,253
25,676
kWh
$1,758
124
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,390
Cost:
$163,711
$17,090 348,797 $21,157 1,480 $8,343 - $17,800 1,075 $17,090
348,797
kWh
$21,157
1,480
kW-months/year
$8,343
-
$
$17,800
1,075
MMBtu
TOTAL IMPLEMENTED Savings:
$2,000
Cost:
$1,600
$2,000 39,760 - - - - - - $2,000
39,760
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas