Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2008
Principal Product Condensed Milk
NAICS 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023 - Dry, Condensed, Evaporated Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 158,750
Annual Production 31,593 Tons
Production Hrs. Annual 8,760
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $291,631 6,272,880 kWh $0.05
Electricity Demand $131,662 12,617 kW-months/year $10.44
Electricity Fees $2,762 - $ -
Natural Gas $1,408,583 182,263 MMBtu $7.73
TOTAL ENERGY COSTS $1,834,638
RECOMMENDED SAVINGS* $188,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $119,925
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,401
Cost:
$13,400
$14,360 206,035 $3,378 282 - - $3,663 - $14,360
206,035
kWh
$3,378
282
kW-months/year
-
-
MMBtu
$3,663
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,785
Cost:
$23,530
$12,600 180,806 $2,970 248 - - $3,215 - $12,600
180,806
kWh
$2,970
248
kW-months/year
-
-
MMBtu
$3,215
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,700
Cost:
$11,100
$6,790 97,455 $1,600 134 - - $1,310 - $6,790
97,455
kWh
$1,600
134
kW-months/year
-
-
MMBtu
$1,310
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,685
Cost:
$7,344
$2,400 34,532 $575 48 - - $710 - $2,400
34,532
kWh
$575
48
kW-months/year
-
-
MMBtu
$710
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$55,100
Cost:
$20,000
- - - - $55,100 5,946 - - -
-
kWh
-
-
kW-months/year
$55,100
5,946
MMBtu
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$37,200
Cost:
$1,000
- - - - $37,200 4,014 - - -
-
kWh
-
-
kW-months/year
$37,200
4,014
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$13,600
Cost:
$8,310
- - - - $13,600 1,468 - - -
-
kWh
-
-
kW-months/year
$13,600
1,468
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,275
Cost:
$4,900
$12,275 194,706 - - - - - - $12,275
194,706
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,750
Cost:
$1,600
$1,750 25,065 - - - - - - $1,750
25,065
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$15,500
Cost:
$32,800
- - - - - - $15,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,500
-
$
TOTAL RECOMMENDED Savings:
$188,996
Cost:
$123,984
$50,175 738,599 $8,523 712 $105,900 11,428 $24,398 - $50,175
738,599
kWh
$8,523
712
kW-months/year
$105,900
11,428
MMBtu
$24,398
-
$
TOTAL IMPLEMENTED Savings:
$119,925
Cost:
$35,810
$14,025 219,771 - - $105,900 11,428 - - $14,025
219,771
kWh
-
-
kW-months/year
$105,900
11,428
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes