IAC logo
IAC Assessment: TT0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2010
Principal Product steel stamping
NAICS 336370 - Motor Vehicle Metal Stamping
SIC 3465 - Automotive Stampings
Sales $100,000,000-$500,000,000
# of Employees 322
Plant Area (Sq.Ft.) 680,000
Annual Production 29,641,500 Pieces
Production Hrs. Annual 4,750
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $586,727 14,510,000 kWh $0.04
Electricity Demand $504,029 37,453 kW-months/year $13.46
Electricity Fees $65,618 - $ -
Natural Gas $77,136 5,901 MMBtu $13.07
TOTAL ENERGY COSTS $1,313,040
RECOMMENDED SAVINGS* $211,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$56,000
Cost:
$1,000
$24,500 766,400 $31,500 2,417 - - - - $24,500
766,400
kWh
$31,500
2,417
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$97,000
Cost:
$421,000
$35,400 1,105,800 $36,400 2,794 - - $25,200 - $35,400
1,105,800
kWh
$36,400
2,794
kW-months/year
-
-
$
$25,200
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$35,900
Cost:
$91,150
$16,000 498,750 $16,400 1,260 $3,500 - - - $16,000
498,750
kWh
$16,400
1,260
kW-months/year
$3,500
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,500
Cost:
$4,500
$18,500 579,300 - - - - - - $18,500
579,300
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,400
Cost:
$4,500
$4,400 134,900 - - - - - - $4,400
134,900
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$211,800
Cost:
$522,150
$98,800 3,085,150 $84,300 6,471 $3,500 - $25,200 - $98,800
3,085,150
kWh
$84,300
6,471
kW-months/year
$3,500
-
$
$25,200
-
$
TOTAL IMPLEMENTED Savings:
$56,000
Cost:
$1,000
$24,500 766,400 $31,500 2,417 - - - - $24,500
766,400
kWh
$31,500
2,417
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost