Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2010 |
Principal Product | EPS Loose fill |
NAICS | 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3085 - Plastics Bottles |
Sales | $10,000,000-$50,000,000 |
# of Employees | 126 |
Plant Area (Sq.Ft.) | 266,940 |
Annual Production | 20,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $807,551 | 10,550,400 | kWh | $0.08 |
Natural Gas | $9,786 | 1,215 | MMBtu | $8.05 |
TOTAL ENERGY COSTS | $817,337 | |||
RECOMMENDED SAVINGS* | $65,019 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,756 |
#|Description |
Savings Cost |
Status | Electricity Usage | Ancillary Material Cost | Electricity Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $5,280 Cost: $9,600 |
$5,280 | 104,519 | - | - |
$5,280 104,519 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $9,803 Cost: $4,000 |
$9,803 | 194,036 | - | - |
$9,803 194,036 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,257 Cost: $50 |
$1,257 | 24,889 | - | - |
$1,257 24,889 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $16,200 Cost: $18,200 |
$16,200 | 321,000 | - | - |
$16,200 321,000 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $21,756 Cost: $173,505 |
$16,614 | 325,775 | $5,142 | - |
$16,614 325,775 kWh |
$5,142 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $10,723 Cost: - |
$10,723 | 204,449 | - | - |
$10,723 204,449 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,019 Cost: $205,355 |
$59,877 | 1,174,668 | $5,142 | - | $59,877 1,174,668 kWh |
$5,142 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,756 Cost: $173,505 |
$16,614 | 325,775 | $5,142 | - | $16,614 325,775 kWh |
$5,142 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |