IAC logo
IAC Assessment: TT0069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2011
Principal Product HVAC Coils
NAICS 332996 - Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498 - Fabricated Pipe And Fittings
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 68,000
Annual Production 15,000 Pieces
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,470 1,015,920 kWh $0.06
Electricity Demand $26,841 3,090 kW-months/year $8.69
Electricity Fees $1,668 - $ -
Natural Gas $8,230 1,146 MMBtu $7.18
TOTAL ENERGY COSTS $100,585
RECOMMENDED SAVINGS* $8,656 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,768
Cost:
-
$1,768 19,968 - - $1,768
19,968
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,271
Cost:
$3,600
$3,271 36,940 - - $3,271
36,940
kWh
-
-
$
03: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$549
Cost:
$600
$549 6,200 - - $549
6,200
kWh
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$985
Cost:
$1,980
- - $985 - -
-
kWh
$985
-
$
05: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$2,083
Cost:
$4,900
$2,083 23,528 - - $2,083
23,528
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$8,656
Cost:
$11,080
$7,671 86,636 $985 - $7,671
86,636
kWh
$985
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees