IAC Assessment: TT0071
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0071
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2011
Principal Product Electric Heating Elements
NAICS 335210 - Small Electrical Appliance Manufacturing
SIC 3634 - Electric Housewares And Fans
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 220,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 2,750
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,348 4,186,580 kWh $0.05
Electricity Demand $166,621 16,692 kW-months/year $9.98
Electricity Fees $12,139 - $ -
Natural Gas $24,448 2,673 MMBtu $9.15
TOTAL ENERGY COSTS $429,555
RECOMMENDED SAVINGS* $105,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43,100
Cost:
$66,100
$16,800 264,552 $8,600 794 - - $17,700 - $16,800
264,552
kWh
$8,600
794
kW-months/year
-
-
MMBtu
$17,700
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,400
Cost:
$52,100
$15,000 236,000 $7,700 708 - - $4,700 - $15,000
236,000
kWh
$7,700
708
kW-months/year
-
-
MMBtu
$4,700
-
$
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$13,100
Cost:
$8,000
$9,330 118,664 - - $3,770 405 - - $9,330
118,664
kWh
-
-
kW-months/year
$3,770
405
MMBtu
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,700
Cost:
$5
$1,700 26,842 - - - - - - $1,700
26,842
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,900
Cost:
$5,000
$10,900 171,265 - - - - - - $10,900
171,265
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,600
Cost:
$3,000
- - - - $4,600 498 - - -
-
kWh
-
-
kW-months/year
$4,600
498
MMBtu
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$4,400
Cost:
$9,000
$4,400 72,696 - - - - - - $4,400
72,696
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$105,200
Cost:
$143,205
$58,130 890,019 $16,300 1,502 $8,370 903 $22,400 - $58,130
890,019
kWh
$16,300
1,502
kW-months/year
$8,370
903
MMBtu
$22,400
-
$
TOTAL IMPLEMENTED Savings:
$72,200
Cost:
$118,205
$33,500 527,394 $16,300 1,502 - - $22,400 - $33,500
527,394
kWh
$16,300
1,502
kW-months/year
-
-
MMBtu
$22,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes