IAC Assessment: TT0074
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0074
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2011
Principal Product Auto Parts
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales >$500,000,000
# of Employees 700
Plant Area (Sq.Ft.) 800,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,890,886 30,432,000 kWh $0.06
Electricity Demand $790,429 66,800 kW-months/year $11.83
Electricity Fees $(-169,155) - $ -
Natural Gas $128,564 21,611 MMBtu $5.95
TOTAL ENERGY COSTS $2,640,724
RECOMMENDED SAVINGS* $179,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,755
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,855
Cost:
$61,400
$20,900 347,500 $7,455 834 - - $5,500 - $20,900
347,500
kWh
$7,455
834
kW-months/year
-
-
MMBtu
$5,500
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,100
Cost:
$5,000
$3,100 42,924 - - - - - - $3,100
42,924
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$48,800
Cost:
$37,500
$48,800 675,854 - - - - - - $48,800
675,854
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$25,250
Cost:
$7,500
$25,250 420,705 - - - - - - $25,250
420,705
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$52,200
Cost:
$95,100
$36,000 599,283 $16,200 1,812 - - - - $36,000
599,283
kWh
$16,200
1,812
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,100
Cost:
$12,000
- - - - $6,100 1,012 - - -
-
kWh
-
-
kW-months/year
$6,100
1,012
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,300
Cost:
$21,000
- - $10,300 805 - - - - -
-
kWh
$10,300
805
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$179,605
Cost:
$239,500
$134,050 2,086,266 $33,955 3,451 $6,100 1,012 $5,500 - $134,050
2,086,266
kWh
$33,955
3,451
kW-months/year
$6,100
1,012
MMBtu
$5,500
-
$
TOTAL IMPLEMENTED Savings:
$85,755
Cost:
$103,900
$72,800 1,066,278 $7,455 834 - - $5,500 - $72,800
1,066,278
kWh
$7,455
834
kW-months/year
-
-
MMBtu
$5,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes