IAC logo
IAC Assessment: TT0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2011
Principal Product Labels
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 60,000
Annual Production 29,150 Thousand Feet
Production Hrs. Annual 4,500
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,532 1,264,600 kWh $0.07
Electricity Demand $42,603 3,522 kW-months/year $12.10
Electricity Fees $1,922 - $ -
Natural Gas $5,684 588 MMBtu $9.66
TOTAL ENERGY COSTS $138,858
RECOMMENDED SAVINGS* $18,179 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,311
Cost:
-
$4,363 66,400 $2,948 199 - - $4,363
66,400
kWh
$2,948
199
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,661
Cost:
$5,000
$4,661 70,920 - - - - $4,661
70,920
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,735
Cost:
$1,654
$257 3,907 $158 11 $1,320 - $257
3,907
kWh
$158
11
kW-months/year
$1,320
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,371
Cost:
$4,540
$1,369 20,830 - - $2 - $1,369
20,830
kWh
-
-
kW-months/year
$2
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,101
Cost:
$13,238
$1,938 29,486 $652 44 $511 - $1,938
29,486
kWh
$652
44
kW-months/year
$511
-
$
TOTAL RECOMMENDED Savings:
$18,179
Cost:
$24,432
$12,588 191,543 $3,758 254 $1,833 - $12,588
191,543
kWh
$3,758
254
kW-months/year
$1,833
-
$
TOTAL IMPLEMENTED Savings:
$11,972
Cost:
$5,000
$9,024 137,320 $2,948 199 - - $9,024
137,320
kWh
$2,948
199
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost