IAC logo
IAC Assessment: TT0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2011
Principal Product plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales <$500,000
# of Employees 50
Plant Area (Sq.Ft.) 116,640
Annual Production 1 Units
Production Hrs. Annual 2,340
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,337 1,170,488 kWh $0.12
Electricity Demand $55,787 5,278 kW-months/year $10.57
Electricity Fees $12,881 - $ -
Natural Gas $27,251 4,388 MMBtu $6.21
TOTAL ENERGY COSTS $239,257
RECOMMENDED SAVINGS* $20,117 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,803
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,923
Cost:
$18,044
$6,923 115,439 - - $6,923
115,439
kWh
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,602
Cost:
$28,092
$4,602 76,744 - - $4,602
76,744
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,878
Cost:
$11,643
$1,878 31,309 - - $1,878
31,309
kWh
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,256
Cost:
$1,480
$1,256 20,932 - - $1,256
20,932
kWh
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,673
Cost:
$15
- - $1,673 - -
-
kWh
$1,673
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,834
Cost:
$1,500
$2,834 47,236 - - $2,834
47,236
kWh
-
-
$
07: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$952
Cost:
$2,625
$952 15,869 - - $952
15,869
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$20,117
Cost:
$63,399
$18,445 307,529 $1,673 - $18,445
307,529
kWh
$1,673
-
$
TOTAL IMPLEMENTED Savings:
$10,803
Cost:
$22,164
$9,131 152,240 $1,673 - $9,131
152,240
kWh
$1,673
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes