IAC logo
IAC Assessment: TT0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2012
Principal Product Railroad Crossties
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 72,000
Annual Production 1,100,000 Pieces
Production Hrs. Annual 8,400
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $167,019 3,109,110 kWh $0.05
Electricity Demand $104,051 10,612 kW-months/year $9.81
Electricity Fees $68,007 - $ -
TOTAL ENERGY COSTS $339,077
RECOMMENDED SAVINGS* $45,539 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $115
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,296
Cost:
$6,000
$2,648 34,864 $648 48 $2,648
34,864
kWh
$648
48
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,912
Cost:
$3,000
$2,286 33,700 $626 46 $2,286
33,700
kWh
$626
46
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,245
Cost:
$3,500
$2,505 39,900 $740 55 $2,505
39,900
kWh
$740
55
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,391
Cost:
$15,000
$10,334 164,600 $3,057 226 $10,334
164,600
kWh
$3,057
226
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,504
Cost:
$4,500
$4,504 66,437 - - $4,504
66,437
kWh
-
-
kW-months/year
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$115
Cost:
$10
$115 1,226 - - $115
1,226
kWh
-
-
kW-months/year
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$216
Cost:
$2,128
$152 2,420 $64 5 $152
2,420
kWh
$64
5
kW-months/year
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,819
Cost:
$6,000
$1,282 20,420 $537 40 $1,282
20,420
kWh
$537
40
kW-months/year
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,757
Cost:
$45,510
$9,697 154,452 $4,060 300 $9,697
154,452
kWh
$4,060
300
kW-months/year
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,284
Cost:
$6,653
$1,610 24,935 $674 50 $1,610
24,935
kWh
$674
50
kW-months/year
TOTAL RECOMMENDED Savings:
$45,539
Cost:
$92,301
$35,133 542,954 $10,406 768 $35,133
542,954
kWh
$10,406
768
kW-months/year
TOTAL IMPLEMENTED Savings:
$115
Cost:
$10
$115 1,226 - - $115
1,226
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand