Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2012 |
Principal Product | Porcelain Floor Tile |
NAICS | 327120 - Clay Building Material and Refractories Manufacturing |
SIC | 3255 - Clay Refractories |
Sales | $100,000,000-$500,000,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 750,000 |
Annual Production | 3,000 Thousand Feet |
Production Hrs. Annual | 8,760 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,633,766 | 30,339,485 | kWh | $0.05 |
Electricity Demand | $808,729 | 101,422 | kW-months/year | $7.97 |
Natural Gas | $2,145,767 | 448,793 | MMBtu | $4.78 |
TOTAL ENERGY COSTS | $4,588,262 | |||
RECOMMENDED SAVINGS* | $905,573 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $535,231 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,692 Cost: $10,000 |
- | - | - | - | $8,692 | 1,818 |
- - kWh |
- - kW-months/year |
$8,692 1,818 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $332,198 Cost: $240,000 |
- | - | - | - | $332,198 | 53,558 |
- - kWh |
- - kW-months/year |
$332,198 53,558 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $12,922 Cost: $3,000 |
$10,672 | 197,642 | $2,250 | 282 | - | - |
$10,672 197,642 kWh |
$2,250 282 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,063 Cost: $3,000 |
$5,829 | 107,958 | $1,234 | 155 | - | - |
$5,829 107,958 kWh |
$1,234 155 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,302 Cost: $30,000 |
$9,302 | 172,262 | - | - | - | - |
$9,302 172,262 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,772 Cost: $20 |
$24,772 | 458,742 | - | - | - | - |
$24,772 458,742 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $356,049 Cost: $220,018 |
$294,024 | 5,444,880 | $62,025 | 7,778 | - | - |
$294,024 5,444,880 kWh |
$62,025 7,778 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $494 Cost: $5,940 |
$408 | 7,560 | $86 | 11 | - | - |
$408 7,560 kWh |
$86 11 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $538 Cost: $858 |
$444 | 8,224 | $94 | 12 | - | - |
$444 8,224 kWh |
$94 12 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $700 Cost: $5,850 |
$578 | 10,710 | $122 | 15 | - | - |
$578 10,710 kWh |
$122 15 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,312 Cost: $20,358 |
$6,038 | 111,812 | $1,274 | 160 | - | - |
$6,038 111,812 kWh |
$1,274 160 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $693 Cost: $1,225 |
$572 | 10,584 | $121 | 15 | - | - |
$572 10,584 kWh |
$121 15 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $134,178 Cost: $87,250 |
$110,814 | 2,052,120 | $23,364 | 2,932 | - | - |
$110,814 2,052,120 kWh |
$23,364 2,932 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,937 Cost: $23,284 |
$1,600 | 29,635 | $337 | 42 | - | - |
$1,600 29,635 kWh |
$337 42 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,403 Cost: $10,218 |
$5,288 | 97,936 | $1,115 | 140 | - | - |
$5,288 97,936 kWh |
$1,115 140 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $858 Cost: $7,176 |
$709 | 13,138 | $149 | 19 | - | - |
$709 13,138 kWh |
$149 19 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,120 Cost: $3,120 |
$925 | 17,136 | $195 | 25 | - | - |
$925 17,136 kWh |
$195 25 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $342 Cost: $595 |
$277 | 5,141 | $65 | 8 | - | - |
$277 5,141 kWh |
$65 8 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $905,573 Cost: $671,912 |
$472,252 | 8,745,480 | $92,431 | 11,593 | $340,890 | 55,376 | $472,252 8,745,480 kWh |
$92,431 11,593 kW-months/year |
$340,890 55,376 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $535,231 Cost: $390,614 |
$447,939 | 8,295,207 | $87,292 | 10,949 | - | - | $447,939 8,295,207 kWh |
$87,292 10,949 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |