Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2012 |
Principal Product | Aluminum Extrusions |
NAICS | 331318 - Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354 - Aluminum Extruded Products |
Sales | $100,000,000-$500,000,000 |
# of Employees | 364 |
Plant Area (Sq.Ft.) | 475,000 |
Annual Production | 59,000,000 Pounds |
Production Hrs. Annual | 6,732 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,338,365 | 34,012,189 | kWh | $0.04 |
Electricity Demand | $1,017,169 | 75,919 | kW-months/year | $13.40 |
Natural Gas | $2,179,015 | 472,961 | MMBtu | $4.61 |
TOTAL ENERGY COSTS | $4,677,909 | |||
RECOMMENDED SAVINGS* | $245,108 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,874 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1224 REPLACE BOILER |
Savings: $8,685 Cost: $5,000 |
- | - | - | - | $8,685 | 1,884 |
- - kWh |
- - kW-months/year |
$8,685 1,884 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $165,758 Cost: $300,000 |
- | - | - | - | $165,758 | 35,956 |
- - kWh |
- - kW-months/year |
$165,758 35,956 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $9,681 Cost: $50,000 |
- | - | - | - | $9,681 | 2,100 |
- - kWh |
- - kW-months/year |
$9,681 2,100 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,770 Cost: $1,195 |
- | - | - | - | $1,770 | 384 |
- - kWh |
- - kW-months/year |
$1,770 384 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,668 Cost: $7,000 |
$3,098 | 81,518 | $3,570 | 266 | - | - |
$3,098 81,518 kWh |
$3,570 266 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $190 Cost: $10 |
$128 | 3,372 | $62 | 5 | - | - |
$128 3,372 kWh |
$62 5 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $39,751 Cost: $33,080 |
$25,546 | 672,257 | $14,205 | 1,060 | - | - |
$25,546 672,257 kWh |
$14,205 1,060 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $538 Cost: $625 |
$255 | 6,698 | $283 | 21 | - | - |
$255 6,698 kWh |
$283 21 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $12,067 Cost: $8,672 |
$7,959 | 209,446 | $4,108 | 307 | - | - |
$7,959 209,446 kWh |
$4,108 307 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $245,108 Cost: $405,582 |
$36,986 | 973,291 | $22,228 | 1,659 | $185,894 | 40,324 | $36,986 973,291 kWh |
$22,228 1,659 kW-months/year |
$185,894 40,324 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,874 Cost: $46,275 |
$28,644 | 753,775 | $17,775 | 1,326 | $10,455 | 2,268 | $28,644 753,775 kWh |
$17,775 1,326 kW-months/year |
$10,455 2,268 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |