IAC Assessment: TT0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2013
Principal Product Corrugated Containers
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2675 - Die-cut Paper And Board
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 120,000
Annual Production 1,170,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $472,465 7,384,000 kWh $0.06
Electricity Demand $150,062 14,251 kW-months/year $10.53
Electricity Fees $(-51,668) - $ -
Natural Gas $237,299 69,750 MMBtu $3.40
TOTAL ENERGY COSTS $836,679
RECOMMENDED SAVINGS* $77,168 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,590
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,590
Cost:
$1,500
- - - - - - $1,590 467 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,590
467
MMBtu
-
-
Tgal
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,000
Cost:
$50,000
- - - - - - $10,000 2,939 - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,000
2,939
MMBtu
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,416
Cost:
$10,000
$6,868 107,310 $1,548 147 - - - - - - $6,868
107,310
kWh
$1,548
147
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$24,521
Cost:
$31,163
$20,014 312,719 $4,507 428 - - - - - - $20,014
312,719
kWh
$4,507
428
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$566
Cost:
$1,364
$347 5,416 $219 21 - - - - - - $347
5,416
kWh
$219
21
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
06: 2.8112 COMBINE UTILITY METERS Savings:
$25,405
Cost:
$5,000
- - - - $25,405 - - - - - -
-
kWh
-
-
kW-months/year
$25,405
-
$
-
-
MMBtu
-
-
Tgal
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$6,670
Cost:
$500
- - - - - - - - $6,670 1,111,338 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$6,670
1,111,338
Tgal
TOTAL RECOMMENDED Savings:
$77,168
Cost:
$99,527
$27,229 425,445 $6,274 596 $25,405 - $11,590 3,406 $6,670 1,111,338 $27,229
425,445
kWh
$6,274
596
kW-months/year
$25,405
-
$
$11,590
3,406
MMBtu
$6,670
1,111,338
Tgal
TOTAL IMPLEMENTED Savings:
$1,590
Cost:
$1,500
- - - - - - $1,590 467 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,590
467
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal