IAC Assessment: TT0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2013
Principal Product Mattresses, box springs, and bedding related accessories
NAICS 337910 - Mattress Manufacturing
SIC 2515 - Mattresses And Bedsprings
Sales <$500,000
# of Employees 50
Plant Area (Sq.Ft.) 110,000
Annual Production 0 Pieces
Production Hrs. Annual 2,080
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,363 195,920 kWh $0.12
Electricity Demand $4,083 988 kW-months/year $4.13
Natural Gas $2,861 294 MMBtu $9.72
TOTAL ENERGY COSTS $31,306
RECOMMENDED SAVINGS* $11,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,126
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,126
Cost:
$10,709
$1,126 9,381 - - $1,126
9,381
kWh
-
-
kW-months/year
02: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS Savings:
$5,367
Cost:
$8,075
$5,367 44,728 - - $5,367
44,728
kWh
-
-
kW-months/year
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,110
Cost:
$1,110
$1,110 9,254 - - $1,110
9,254
kWh
-
-
kW-months/year
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$4,000
Cost:
$980
$3,224 25,444 $776 188 $3,224
25,444
kWh
$776
188
kW-months/year
TOTAL RECOMMENDED Savings:
$11,604
Cost:
$20,874
$10,828 88,807 $776 188 $10,828
88,807
kWh
$776
188
kW-months/year
TOTAL IMPLEMENTED Savings:
$5,126
Cost:
$11,689
$4,350 34,825 $776 188 $4,350
34,825
kWh
$776
188
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand