Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2013 |
Principal Product | Mattresses, box springs, and bedding related accessories |
NAICS | 337910 - Mattress Manufacturing |
SIC | 2515 - Mattresses And Bedsprings |
Sales | <$500,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $24,363 | 195,920 | kWh | $0.12 |
Electricity Demand | $4,083 | 988 | kW-months/year | $4.13 |
Natural Gas | $2,861 | 294 | MMBtu | $9.72 |
TOTAL ENERGY COSTS | $31,306 | |||
RECOMMENDED SAVINGS* | $11,604 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,126 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,126 Cost: $10,709 |
$1,126 | 9,381 | - | - |
$1,126 9,381 kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3513 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS |
Savings: $5,367 Cost: $8,075 |
$5,367 | 44,728 | - | - |
$5,367 44,728 kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,110 Cost: $1,110 |
$1,110 | 9,254 | - | - |
$1,110 9,254 kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $4,000 Cost: $980 |
$3,224 | 25,444 | $776 | 188 |
$3,224 25,444 kWh |
$776 188 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,604 Cost: $20,874 |
$10,828 | 88,807 | $776 | 188 | $10,828 88,807 kWh |
$776 188 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,126 Cost: $11,689 |
$4,350 | 34,825 | $776 | 188 | $4,350 34,825 kWh |
$776 188 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||