IAC logo
IAC Assessment: TT0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2013
Principal Product N/A
NAICS 611310 - Colleges, Universities, and Professional Schools
SIC 8221 - Colleges And Universities
Sales <$500,000
# of Employees 6
Plant Area (Sq.Ft.) 6,300
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $39,800 497,568 kWh $0.08
Natural Gas $439,734 109,418 MMBtu $4.02
Coal $570,044 99,037 MMBtu $5.76
TOTAL ENERGY COSTS $1,070,108
RECOMMENDED SAVINGS* $385,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $373,330
#|Description Savings
Cost
Status Electricity Usage Natural Gas Coal Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Coal Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ MMBtu $ lb $ $
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$362,330
Cost:
$650,000
$39,800 497,568 - - $174,000 30,229 $20,530 6,728,000 $128,000 - $39,800
497,568
kWh
-
-
MMBtu
$174,000
30,229
MMBtu
$20,530
6,728,000
lb
$128,000
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$11,000
Cost:
$60,000
- - $11,000 2,200 - - - - - - -
-
kWh
$11,000
2,200
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$11,915
Cost:
$11,497
- - $11,915 2,383 - - - - - - -
-
kWh
$11,915
2,383
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$385,245
Cost:
$721,497
$39,800 497,568 $22,915 4,583 $174,000 30,229 $20,530 6,728,000 $128,000 - $39,800
497,568
kWh
$22,915
4,583
MMBtu
$174,000
30,229
MMBtu
$20,530
6,728,000
lb
$128,000
-
$
TOTAL IMPLEMENTED Savings:
$373,330
Cost:
$710,000
$39,800 497,568 $11,000 2,200 $174,000 30,229 $20,530 6,728,000 $128,000 - $39,800
497,568
kWh
$11,000
2,200
MMBtu
$174,000
30,229
MMBtu
$20,530
6,728,000
lb
$128,000
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ lb $ $
Electricity Usage Natural Gas Coal Solid Waste (non-haz) Personnel Changes Electricity Usage Natural Gas Coal Solid Waste (non-haz) Personnel Changes