Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2013 |
Principal Product | N/A |
NAICS | 611310 - Colleges, Universities, and Professional Schools |
SIC | 8221 - Colleges And Universities |
Sales | <$500,000 |
# of Employees | 6 |
Plant Area (Sq.Ft.) | 6,300 |
Annual Production | 0 Units |
Production Hrs. Annual | 8,760 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $39,800 | 497,568 | kWh | $0.08 |
Natural Gas | $439,734 | 109,418 | MMBtu | $4.02 |
Coal | $570,044 | 99,037 | MMBtu | $5.76 |
TOTAL ENERGY COSTS | $1,070,108 | |||
RECOMMENDED SAVINGS* | $385,245 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $373,330 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Coal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Coal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS |
Savings: $362,330 Cost: $650,000 |
$39,800 | 497,568 | - | - | $174,000 | 30,229 | $20,530 | 6,728,000 | $128,000 | - |
$39,800 497,568 kWh |
- - MMBtu |
$174,000 30,229 MMBtu |
$20,530 6,728,000 lb |
$128,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $11,000 Cost: $60,000 |
- | - | $11,000 | 2,200 | - | - | - | - | - | - |
- - kWh |
$11,000 2,200 MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $11,915 Cost: $11,497 |
- | - | $11,915 | 2,383 | - | - | - | - | - | - |
- - kWh |
$11,915 2,383 MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $385,245 Cost: $721,497 |
$39,800 | 497,568 | $22,915 | 4,583 | $174,000 | 30,229 | $20,530 | 6,728,000 | $128,000 | - | $39,800 497,568 kWh |
$22,915 4,583 MMBtu |
$174,000 30,229 MMBtu |
$20,530 6,728,000 lb |
$128,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $373,330 Cost: $710,000 |
$39,800 | 497,568 | $11,000 | 2,200 | $174,000 | 30,229 | $20,530 | 6,728,000 | $128,000 | - | $39,800 497,568 kWh |
$11,000 2,200 MMBtu |
$174,000 30,229 MMBtu |
$20,530 6,728,000 lb |
$128,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Coal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Natural Gas | Coal | Solid Waste (non-haz) | Personnel Changes |