IAC Assessment: TT0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2013
Principal Product Hardwood Lumber
NAICS 321114 - Wood Preservation
SIC 2491 - Wood Preserving
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 500,000
Annual Production 9,330,241 Units
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,458 3,546,000 kWh $0.07
Electricity Demand $111,367 9,339 kW-months/year $11.93
Wood $109,244 49,416 MMBtu $2.21
TOTAL ENERGY COSTS $462,069
RECOMMENDED SAVINGS* $42,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,000
#|Description Savings
Cost
Status Electricity Usage Wood Electricity Usage Wood
$ kWh $ MMBtu
01: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$6,000
Cost:
$5,000
- - $6,000 2,715 -
-
kWh
$6,000
2,715
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,000
Cost:
$50,000
- - $17,000 7,692 -
-
kWh
$17,000
7,692
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,000
Cost:
$5,000
$11,000 119,695 - - $11,000
119,695
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,000
Cost:
$4,000
$7,000 76,170 - - $7,000
76,170
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,000
Cost:
$1,500
$1,000 10,881 - - $1,000
10,881
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$42,000
Cost:
$65,500
$19,000 206,746 $23,000 10,407 $19,000
206,746
kWh
$23,000
10,407
MMBtu
TOTAL IMPLEMENTED Savings:
$19,000
Cost:
$10,500
$19,000 206,746 - - $19,000
206,746
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Wood Electricity Usage Wood