IAC logo
IAC Assessment: TT0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2013
Principal Product Greeting Cards
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2771 - Greeting Cards
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 145,000
Annual Production 185,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $558,675 11,937,199 kWh $0.05
Electricity Demand $418,424 36,604 kW-months/year $11.43
Natural Gas $16,995 2,613 MMBtu $6.50
TOTAL ENERGY COSTS $1,026,857
RECOMMENDED SAVINGS* $42,318 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,801
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$8,640
Cost:
-
$6,034 120,695 $2,606 228 - - $6,034
120,695
kWh
$2,606
228
kW-months/year
-
-
MMBtu
02: 2.7122 DISCONNECT BALLASTS Savings:
$517
Cost:
-
$394 7,884 $123 11 - - $394
7,884
kWh
$123
11
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,012
Cost:
$90
$167 3,346 $845 74 - - $167
3,346
kWh
$845
74
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$22,871
Cost:
$6,600
$22,871 457,433 - - - - $22,871
457,433
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$132
Cost:
$233
$99 1,979 $33 3 - - $99
1,979
kWh
$33
3
kW-months/year
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,770
Cost:
$7,200
- - - - $5,770 888 -
-
kWh
-
-
kW-months/year
$5,770
888
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,376
Cost:
$7,150
$2,472 49,457 $904 79 - - $2,472
49,457
kWh
$904
79
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$42,318
Cost:
$21,273
$32,037 640,794 $4,511 395 $5,770 888 $32,037
640,794
kWh
$4,511
395
kW-months/year
$5,770
888
MMBtu
TOTAL IMPLEMENTED Savings:
$41,801
Cost:
$21,273
$31,643 632,910 $4,388 384 $5,770 888 $31,643
632,910
kWh
$4,388
384
kW-months/year
$5,770
888
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas