IAC logo
IAC Assessment: TT0123
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0123
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2013
Principal Product Plastic Automotive Parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 85,000
Annual Production 3,500,000 Pieces
Production Hrs. Annual 6,000
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $413,656 6,258,120 kWh $0.07
Electricity Demand $154,749 15,189 kW-months/year $10.19
Electricity Fees $(-54,492) - $ -
Natural Gas $5,925 703 MMBtu $8.43
TOTAL ENERGY COSTS $527,515
RECOMMENDED SAVINGS* $106,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,531
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$862
Cost:
$50
$658 9,972 $204 20 - - $658
9,972
kWh
$204
20
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,327
Cost:
$3,526
$689 10,440 $638 63 - - $689
10,440
kWh
$638
63
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$775
Cost:
$835
$592 8,976 $183 18 - - $592
8,976
kWh
$183
18
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,294
Cost:
$27,232
$10,920 165,600 $3,374 331 - - $10,920
165,600
kWh
$3,374
331
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,752
Cost:
$10,856
$2,150 32,500 $602 59 - - $2,150
32,500
kWh
$602
59
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,151
Cost:
$64,014
$3,936 59,640 $1,215 119 - - $3,936
59,640
kWh
$1,215
119
kW-months/year
-
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$6,774
Cost:
$500
$6,774 104,897 - - - - $6,774
104,897
kWh
-
-
kW-months/year
-
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$71,348
Cost:
$9,384
- - - - $71,348 - -
-
kWh
-
-
kW-months/year
$71,348
-
$
09: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$305
Cost:
-
- - - - $305 - -
-
kWh
-
-
kW-months/year
$305
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,590
Cost:
$6,000
$1,979 29,992 $611 60 - - $1,979
29,992
kWh
$611
60
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$106,178
Cost:
$122,397
$27,698 422,017 $6,827 670 $71,653 - $27,698
422,017
kWh
$6,827
670
kW-months/year
$71,653
-
$
TOTAL IMPLEMENTED Savings:
$10,531
Cost:
$6,550
$9,411 144,861 $815 80 $305 - $9,411
144,861
kWh
$815
80
kW-months/year
$305
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees