IAC logo
IAC Assessment: TT0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2014
Principal Product Mustard and Vinegar
NAICS 311941 - Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $10,000,000-$50,000,000
# of Employees 79
Plant Area (Sq.Ft.) 110,000
Annual Production 225,120 Thousand Gallons
Production Hrs. Annual 6,240
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $325,116 5,091,920 kWh $0.06
Electricity Demand $119,757 9,782 kW-months/year $12.24
Electricity Fees $6,978 - $ -
Natural Gas $138,943 14,333 MMBtu $9.69
TOTAL ENERGY COSTS $590,794
RECOMMENDED SAVINGS* $15,397 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,367
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$11,367
Cost:
$1,500
- - - - $11,367 1,173 -
-
kWh
-
-
kW-months/year
$11,367
1,173
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$764
Cost:
$505
- - - - $764 79 -
-
kWh
-
-
kW-months/year
$764
79
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$724
Cost:
$1,000
$724 11,307 - - - - $724
11,307
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$148
Cost:
$240
$148 2,317 - - - - $148
2,317
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$388
Cost:
$360
$388 6,059 - - - - $388
6,059
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$724
Cost:
$720
$724 11,326 - - - - $724
11,326
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,282
Cost:
$550
$981 15,320 $301 25 - - $981
15,320
kWh
$301
25
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,397
Cost:
$4,875
$2,965 46,329 $301 25 $12,131 1,252 $2,965
46,329
kWh
$301
25
kW-months/year
$12,131
1,252
MMBtu
TOTAL IMPLEMENTED Savings:
$11,367
Cost:
$1,500
- - - - $11,367 1,173 -
-
kWh
-
-
kW-months/year
$11,367
1,173
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas