IAC logo
IAC Assessment: TT0130
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0130
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2014
Principal Product RV Appliance and HVAC units
NAICS 333414 - Heating Equipment (except Warm Air Furnaces) Manufacturing
SIC 3433 - Heating Equipment, Except Electric
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 300,000
Annual Production 700,000 Pieces
Production Hrs. Annual 4,375
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,540 3,486,464 kWh $0.06
Electricity Demand $164,920 14,113 kW-months/year $11.69
Electricity Fees $13,515 - $ -
Natural Gas $224,569 42,940 MMBtu $5.23
LPG $30,427 1,766 MMBtu $17.23
TOTAL ENERGY COSTS $691,395
RECOMMENDED SAVINGS* $52,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,724
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$29,307
Cost:
$44,000
- - $29,307 2,508 -
-
kWh
$29,307
2,508
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,560
Cost:
$12,150
$4,406 68,850 $2,154 184 $4,406
68,850
kWh
$2,154
184
kW-months/year
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,677
Cost:
$4,500
$3,145 49,140 $1,532 131 $3,145
49,140
kWh
$1,532
131
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,047
Cost:
$3,000
$1,377 21,513 $670 57 $1,377
21,513
kWh
$670
57
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,989
Cost:
$20,000
$4,700 73,440 $2,289 196 $4,700
73,440
kWh
$2,289
196
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,191
Cost:
$6,041
$2,146 33,525 $1,045 89 $2,146
33,525
kWh
$1,045
89
kW-months/year
TOTAL RECOMMENDED Savings:
$52,771
Cost:
$89,691
$15,774 246,468 $36,997 3,166 $15,774
246,468
kWh
$36,997
3,166
kW-months/year
TOTAL IMPLEMENTED Savings:
$50,724
Cost:
$86,691
$14,397 224,955 $36,327 3,108 $14,397
224,955
kWh
$36,327
3,108
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand