IAC logo
IAC Assessment: TT0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2014
Principal Product Small electric motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 200,000
Annual Production 2,200,000 Pieces
Production Hrs. Annual 8,760
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,464,928 21,888,160 kWh $0.07
Electricity Demand $163,160 39,127 kW-months/year $4.17
Natural Gas $85,115 8,166 MMBtu $10.42
TOTAL ENERGY COSTS $1,713,202
RECOMMENDED SAVINGS* $265,161 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,917
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,347
Cost:
$972
$2,347 35,030 $2,347
35,030
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,605
Cost:
$30,150
$22,605 337,392 $22,605
337,392
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,715
Cost:
$63,236
$26,715 398,736 $26,715
398,736
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,202
Cost:
$16,590
$3,202 47,795 $3,202
47,795
kWh
05: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$3,687
Cost:
$8,925
$3,687 55,036 $3,687
55,036
kWh
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$206,605
Cost:
$247,740
$206,605 3,103,533 $206,605
3,103,533
kWh
TOTAL RECOMMENDED Savings:
$265,161
Cost:
$367,613
$265,161 3,977,522 $265,161
3,977,522
kWh
TOTAL IMPLEMENTED Savings:
$29,917
Cost:
$79,826
$29,917 446,531 $29,917
446,531
kWh