IAC Assessment: TT0140
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0140
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2014
Principal Product Discrete Rubber Parts
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 196,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 4,800
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,413 2,835,600 kWh $0.06
Electricity Demand $135,616 11,218 kW-months/year $12.09
Electricity Fees $3,785 - $ -
Natural Gas $202,132 32,475 MMBtu $6.22
TOTAL ENERGY COSTS $534,508
RECOMMENDED SAVINGS* $44,991 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,203
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
01: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$3,000
Cost:
$2,000
- - - - $3,000 483 - - - - -
-
kWh
-
-
kW-months/year
$3,000
483
MMBtu
-
-
Tgal
-
-
gal
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,068
Cost:
$1,545
- - - - $1,068 172 - - - - -
-
kWh
-
-
kW-months/year
$1,068
172
MMBtu
-
-
Tgal
-
-
gal
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$4,428
Cost:
$8,000
- - - - $3,728 600 $343 74 $357 74,216 -
-
kWh
-
-
kW-months/year
$3,728
600
MMBtu
$343
74
Tgal
$357
74,216
gal
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$2,430
Cost:
$4,000
- - - - $2,047 330 $188 41 $195 40,736 -
-
kWh
-
-
kW-months/year
$2,047
330
MMBtu
$188
41
Tgal
$195
40,736
gal
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$25,238
Cost:
$36,000
- - $25,238 2,087 - - - - - - -
-
kWh
$25,238
2,087
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,930
Cost:
$825
$1,304 20,702 $626 52 - - - - - - $1,304
20,702
kWh
$626
52
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,206
Cost:
$125
$2,167 34,387 $1,039 86 - - - - - - $2,167
34,387
kWh
$1,039
86
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,333
Cost:
$50
$900 14,300 $433 36 $2,000 313 - - - - $900
14,300
kWh
$433
36
kW-months/year
$2,000
313
MMBtu
-
-
Tgal
-
-
gal
09: 2.7122 DISCONNECT BALLASTS Savings:
$358
Cost:
$50
$283 4,503 $75 6 - - - - - - $283
4,503
kWh
$75
6
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$44,991
Cost:
$52,595
$4,654 73,892 $27,411 2,267 $11,843 1,897 $531 115 $552 114,952 $4,654
73,892
kWh
$27,411
2,267
kW-months/year
$11,843
1,897
MMBtu
$531
115
Tgal
$552
114,952
gal
TOTAL IMPLEMENTED Savings:
$36,203
Cost:
$39,770
$3,350 53,190 $26,785 2,215 $6,068 967 - - - - $3,350
53,190
kWh
$26,785
2,215
kW-months/year
$6,068
967
MMBtu
-
-
Tgal
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)