Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2015 |
Principal Product | Aerosol Manufacturing |
NAICS | 332431 - Metal Can Manufacturing |
SIC | 3411 - Metal Cans |
Sales | $50,000,000-$100,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 142,000 |
Annual Production | 200,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $143,408 | 3,602,100 | kWh | $0.04 |
Electricity Demand | $90,142 | 15,708 | kW-months/year | $5.74 |
Natural Gas | $44,500 | 5,172 | MMBtu | $8.60 |
TOTAL ENERGY COSTS | $278,050 | |||
RECOMMENDED SAVINGS* | $65,581 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,747 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $39,935 Cost: $152,353 |
$30,726 | 772,022 | $9,209 | 1,605 | - | - |
$30,726 772,022 kWh |
$9,209 1,605 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $7,960 Cost: $15,939 |
$7,960 | 199,995 | - | - | - | - |
$7,960 199,995 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $6,030 Cost: $12,000 |
- | - | - | - | $6,030 | 701 |
- - kWh |
- - kW-months/year |
$6,030 701 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,651 Cost: $225 |
$2,834 | 71,201 | $817 | 142 | - | - |
$2,834 71,201 kWh |
$817 142 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,708 Cost: $500 |
$2,708 | 68,040 | - | - | - | - |
$2,708 68,040 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,247 Cost: $3,000 |
$2,247 | 56,457 | - | - | - | - |
$2,247 56,457 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,849 Cost: $125 |
$1,435 | 36,061 | $414 | 72 | - | - |
$1,435 36,061 kWh |
$414 72 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,201 Cost: $1,750 |
$1,028 | 25,818 | $173 | 30 | - | - |
$1,028 25,818 kWh |
$173 30 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,581 Cost: $185,892 |
$48,938 | 1,229,594 | $10,613 | 1,850 | $6,030 | 701 | $48,938 1,229,594 kWh |
$10,613 1,850 kW-months/year |
$6,030 701 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,747 Cost: $3,350 |
$6,516 | 163,719 | $1,231 | 215 | - | - | $6,516 163,719 kWh |
$1,231 215 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |