IAC Assessment: TT0163
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0163
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2015
Principal Product Hand Tools
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3423 - Hand And Edge Tools, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 70,000
Annual Production 50,000 Pieces
Production Hrs. Annual 5,952
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $205,716 3,250,800 kWh $0.06
Electricity Demand $88,345 7,640 kW-months/year $11.56
Natural Gas $10,865 820 MMBtu $13.24
TOTAL ENERGY COSTS $304,927
RECOMMENDED SAVINGS* $17,039 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,297
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,742
Cost:
$5,000
- - - - $4,742 350 -
-
kWh
-
-
kW-months/year
$4,742
350
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,100
Cost:
$4,110
$4,100 64,789 - - - - $4,100
64,789
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,380
Cost:
$1,075
$1,742 27,514 $638 55 - - $1,742
27,514
kWh
$638
55
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,251
Cost:
$75
$1,642 25,947 $609 52 - - $1,642
25,947
kWh
$609
52
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,611
Cost:
$3,000
$1,611 25,443 - - - - $1,611
25,443
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,532
Cost:
$3,013
$783 12,371 $749 65 - - $783
12,371
kWh
$749
65
kW-months/year
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$423
Cost:
$1,500
$423 6,686 - - - - $423
6,686
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$17,039
Cost:
$17,773
$10,301 162,750 $1,996 172 $4,742 350 $10,301
162,750
kWh
$1,996
172
kW-months/year
$4,742
350
MMBtu
TOTAL IMPLEMENTED Savings:
$12,297
Cost:
$12,773
$10,301 162,750 $1,996 172 - - $10,301
162,750
kWh
$1,996
172
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas