IAC logo
IAC Assessment: TT0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2016
Principal Product Exhaust Components
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 241
Plant Area (Sq.Ft.) 87,000
Annual Production 975,000 Pieces
Production Hrs. Annual 4,550
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $161,054 2,525,760 kWh $0.06
Electricity Demand $132,388 9,773 kW-months/year $13.55
Natural Gas $32,051 3,113 MMBtu $10.30
TOTAL ENERGY COSTS $325,493
RECOMMENDED SAVINGS* $107,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,954
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$30,026
Cost:
$4,452
$30,026 469,107 - - - - - - $30,026
469,107
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$27,708
Cost:
$28,000
- - $27,708 2,046 - - - - -
-
kWh
$27,708
2,046
kW-months/year
-
-
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$20,627
Cost:
$5,200
- - - - - - $20,627 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,627
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,188
Cost:
$170,642
$9,259 144,678 $2,929 216 - - - - $9,259
144,678
kWh
$2,929
216
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,407
Cost:
$125
$3,470 54,219 $1,937 143 - - - - $3,470
54,219
kWh
$1,937
143
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$5,213
Cost:
$900
$5,213 81,464 - - - - - - $5,213
81,464
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,887
Cost:
$3,000
$1,627 25,419 $260 19 - - - - $1,627
25,419
kWh
$260
19
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,764
Cost:
$500
- - - - $1,764 171 - - -
-
kWh
-
-
kW-months/year
$1,764
171
MMBtu
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,481
Cost:
$500
$904 14,120 - - $577 56 - - $904
14,120
kWh
-
-
kW-months/year
$577
56
MMBtu
-
-
$
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$815
Cost:
$2,500
$815 12,740 - - - - - - $815
12,740
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$107,116
Cost:
$215,819
$51,314 801,747 $32,834 2,424 $2,341 227 $20,627 - $51,314
801,747
kWh
$32,834
2,424
kW-months/year
$2,341
227
MMBtu
$20,627
-
$
TOTAL IMPLEMENTED Savings:
$48,954
Cost:
$202,267
$14,356 224,316 $32,834 2,424 $1,764 171 - - $14,356
224,316
kWh
$32,834
2,424
kW-months/year
$1,764
171
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $