Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Tennessee Technological University |
---|---|
Assessment Year | 2016 |
Principal Product | remanufatured turbochargers |
NAICS | 333618 - Other Engine Equipment Manufacturing |
SIC | 3519 - Internal Combustion Engines, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 392 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 14,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $481,055 | 7,477,400 | kWh | $0.06 |
Electricity Demand | $189,603 | 17,085 | kW-months/year | $11.10 |
Natural Gas | $110,527 | 17,332 | MMBtu | $6.38 |
TOTAL ENERGY COSTS | $827,351 | |||
RECOMMENDED SAVINGS* | $87,696 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $64,272 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $49,961 Cost: $156,286 |
$41,915 | 654,915 | $1,172 | 106 | - | - | $6,874 | - |
$41,915 654,915 kWh |
$1,172 106 kW-months/year |
- - MMBtu |
$6,874 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $16,670 Cost: $105,000 |
$18,630 | 291,085 | $3,080 | 278 | $(-5,040) | (-790) | - | - |
$18,630 291,085 kWh |
$3,080 278 kW-months/year |
$(-5,040) (-790) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $11,200 Cost: $110,000 |
$2,895 | 45,227 | $7,585 | 683 | $720 | 113 | - | - |
$2,895 45,227 kWh |
$7,585 683 kW-months/year |
$720 113 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,210 Cost: - |
$6,210 | 97,033 | - | - | - | - | - | - |
$6,210 97,033 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $2,435 Cost: $800 |
$2,435 | 38,046 | - | - | - | - | - | - |
$2,435 38,046 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $544 Cost: $1,100 |
$544 | 8,503 | - | - | - | - | - | - |
$544 8,503 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $676 Cost: $1,366 |
$499 | 7,795 | $177 | 16 | - | - | - | - |
$499 7,795 kWh |
$177 16 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $87,696 Cost: $374,552 |
$73,128 | 1,142,604 | $12,014 | 1,082 | $(-4,320) | (-677) | $6,874 | - | $73,128 1,142,604 kWh |
$12,014 1,082 kW-months/year |
$(-4,320) (-677) MMBtu |
$6,874 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $64,272 Cost: $268,452 |
$47,744 | 745,983 | $8,934 | 805 | $720 | 113 | $6,874 | - | $47,744 745,983 kWh |
$8,934 805 kW-months/year |
$720 113 MMBtu |
$6,874 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |